Lindsey Waitt, engineer with NASA’s Exploration Ground Systems Program, participates in a terminal countdown simulation for Artemis III on Thursday, Aug. 6, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s…
Artemis III Launch Simulations (Terminal Count Sim)
Technicians inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida complete integration of the left center center solid rocket booster segment onto the left aft center booster segment for the Artemis III SLS (Space L…
Artemis III booster stacking coverage - LCC Lift/Mate
Technicians prepare the #2 RS-25 SLS (Space Launch System) rocket engine for transfer onto a work stand ahead of integration with the Artemis III core stage rocket on Tuesday, Aug. 25, 2026, inside the Vehicle Assembly Building at NASA’s Ke…
Artemis III RS-25 Engine Processing: #3 Lift
Technicians assist a crane to lower a pair of International Space Station Roll Out Solar Arrays (iROSA) onto a platform on Tuesday, Aug. 11, 2026, inside the Space Systems Processing Facility at NASA’s Kennedy Space Center in Florida. The i…
IROSA Lift for Transport
Technicians inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida complete integration of the left center center solid rocket booster segment onto the left aft center booster segment for the Artemis III SLS (Space L…
Artemis III booster stacking coverage - LCC Lift/Mate
NASA Administrator Jared Isaacman leads a flight of his personally owned F-5 Tiger II aircraft on a flyby of Launch Complex 39A where a SpaceX Falcon Heavy rocket with the agency's Nancy Grace Roman Space Telescope, encapsulated in a protec…
Roman Space Telescope Broadcast Isaacman Fly by 39A
Inside High Bay 2 at NASA’s Vehicle Assembly Building at Kennedy’s Space Center in Florida, the SLS (Space Launch System) core stage rocket is secured in a vertical position as technicians prepare to install the last RS-25 engine to the SLS…
Artemis III RS-25 Engine Processing: #4 Lift
In High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the left aft center booster segment for Artemis III is integrated onto its aft assembly segment on the mobile launcher for the SLS (Space Launch Syste…
Artemis III Booster Stacking Coverage - LAC Mated
Technicians assist a crane to lower a pair of International Space Station Roll Out Solar Arrays (iROSA) onto a platform on Tuesday, Aug. 11, 2026, inside the Space Systems Processing Facility at NASA’s Kennedy Space Center in Florida. The i…
IROSA Lift for Transport
Technicians inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida complete integration of the left center center solid rocket booster segment onto the left aft center booster segment for the Artemis III SLS (Space L…
Artemis III booster stacking coverage - LCC Lift/Mate
Artemis launch team members participate in a terminal countdown simulation for Artemis III on Thursday, Aug. 6, 2026, inside Firing Room 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. The te…
Artemis III Launch Simulations (Terminal Count Sim)
Technicians inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida complete integration of the left center center solid rocket booster segment onto the left aft center booster segment for the Artemis III SLS (Space L…
Artemis III booster stacking coverage - LCC Lift/Mate
Technicians inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida connect a crane to the right center center booster segment for the Artemis III SLS (Space Launch System) rocket on Thursday, Aug. 20, 2026, ahead of…
Artemis III booster stacking coverage - RCC Lift/Mate
The first of four RS-25 SLS (Space Launch System) rocket engines, is installed on the work stand and integrated with the Artemis III core stage rocket on Tuesday, Aug. 25, 2026, inside the Vehicle Assembly Building at NASA’s Kennedy Space C…
Artemis III RS-25 Engine Processing: #3 Lift
In High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the left and right segments for Artemis III prepare for integration onto their aft assembly segments on the mobile launcher for the SLS (Space Launch…
Artemis III Booster Stacking Coverage - LAC Mated
During integration operations inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the NASA “worm” is visible on the left and right center center solid rocket booster segments for the Artemis III SLS (Space Launch…
Artemis III Booster Stacking LCC/RCC Mate
A NASA jacket containing Artemis I and II mission patches, along with other NASA patches hangs on the back of a chair on Thursday, Aug. 6, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Cent…
Artemis III Launch Simulations (Terminal Count Sim)
NASA Administrator Jared Isaacman leads a flight of his personally owned F-5 Tiger II aircraft on a flyby of Launch Complex 39A where a SpaceX Falcon Heavy rocket with the agency's Nancy Grace Roman Space Telescope, encapsulated in a protec…
Roman Space Telescope Broadcast Isaacman Fly by 39A
During integration operations inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the NASA “worm” is visible on the left and right center center solid rocket booster segments for the Artemis III SLS (Space Launch…
Artemis III Booster Stacking LCC/RCC Mate
NASA Administrator Jared Isaacman leads a flight of his personally owned F-5 Tiger II aircraft on a flyby of Launch Complex 39A where a SpaceX Falcon Heavy rocket with the agency's Nancy Grace Roman Space Telescope, encapsulated in a protec…
Roman Space Telescope Broadcast Isaacman Fly by 39A
Technicians lift the #2 RS-25 SLS (Space Launch System) rocket engine to prepare to transfer the engine to the work stand to be integrated with the Artemis III core stage rocket on Tuesday, Aug. 25, 2026, inside the Vehicle Assembly Buildin…
Artemis III RS-25 Engine Processing: #3 Lift
During integration operations inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the NASA “worm” is visible on the left and right center center solid rocket booster segments for the Artemis III SLS (Space Launch…
Artemis III Booster Stacking LCC/RCC Mate
Technicians inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida complete integration of the left center center solid rocket booster segment onto the left aft center booster segment for the Artemis III SLS (Space L…
Artemis III booster stacking coverage - LCC Lift/Mate
Technicians complete installation of all four RS-25 SLS (Space Launch System) rocket engines on the work stand for integration with the Artemis III core stage rocket on Tuesday, Sept. 1, 2026, inside the Vehicle Assembly Building at NASA’s…
Artemis III RS-25 Engine Processing: #4 Lift
The first of four RS-25 SLS (Space Launch System) rocket engines, is installed on the work stand and integrated with the Artemis III core stage rocket on Tuesday, Aug. 25, 2026, inside the Vehicle Assembly Building at NASA’s Kennedy Space C…
Artemis III RS-25 Engine Processing: #3 Lift
Technicians complete installation of all four RS-25 SLS (Space Launch System) rocket engines on the work stand for integration with the Artemis III core stage rocket on Tuesday, Sept. 1, 2026, inside the Vehicle Assembly Building at NASA’s…
Artemis III RS-25 Engine Processing: #4 Lift
NASA Administrator Jared Isaacman leads a flight of his personally owned F-5 Tiger II aircraft on a flyby of Launch Complex 39A where a SpaceX Falcon Heavy rocket with the agency's Nancy Grace Roman Space Telescope, encapsulated in a protec…
Roman Space Telescope Broadcast Isaacman Fly by 39A
Technicians lift and transfer the #2 RS-25 SLS (Space Launch System) rocket engine (back) to the work stand. Visible in the foreground is the #3 engine already integrated with the Artemis III core stage rocket on Tuesday, Aug. 25, 2026, ins…
Artemis III RS-25 Engine Processing: #3 Lift
Technicians prepare the #2 RS-25 SLS (Space Launch System) rocket engine for transfer onto a work stand ahead of integration with the Artemis III core stage rocket on Tuesday, Aug. 25, 2026, inside the Vehicle Assembly Building at NASA’s Ke…
Artemis III RS-25 Engine Processing: #3 Lift
Employees discuss the lift and install operations for the RS-25 SLS (Space Launch System) rocket engines on Tuesday, Aug. 25, 2026, inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. The engines will be installe…
Artemis III RS-25 Engine Processing: #3 Lift
Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kenne…
Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2
Technicians complete installation of all four RS-25 SLS (Space Launch System) rocket engines on the work stand for integration with the Artemis III core stage rocket on Tuesday, Sept. 1, 2026, inside the Vehicle Assembly Building at NASA’s…
Artemis III RS-25 Engine Processing: #4 Lift
Technicians prepare to transfer the #2 RS-25 SLS (Space Launch System) rocket engine (front) to the work stand with the #3 engine (back) for integration with the Artemis III core stage rocket on Tuesday, Aug. 25, 2026, inside the Vehicle As…
Artemis III RS-25 Engine Processing: #3 Lift
NASA Administrator Jared Isaacman leads a flight of his personally owned F-5 Tiger II aircraft on a flyby of Launch Complex 39A where a SpaceX Falcon Heavy rocket with the agency's Nancy Grace Roman Space Telescope, encapsulated in a protec…
Roman Space Telescope Broadcast Isaacman Fly by 39A
During integration operations inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the NASA “worm” is visible on the left and right center center solid rocket booster segments for the Artemis III SLS (Space Launch…
Artemis III Booster Stacking LCC/RCC Mate
Technicians assist a crane to lower a pair of International Space Station Roll Out Solar Arrays (iROSA) onto a platform on Tuesday, Aug. 11, 2026, inside the Space Systems Processing Facility at NASA’s Kennedy Space Center in Florida. The i…
IROSA Lift for Transport
Charlie Blackwell-Thompson, Artemis launch director, participates in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at…
Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2
Lindsey Waitt, engineer with NASA’s Exploration Ground Systems Program, participates in a terminal countdown simulation for Artemis III on Thursday, Aug. 6, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s…
Artemis III Launch Simulations (Terminal Count Sim)
In High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the left aft center booster segment for Artemis III is integrated onto its aft assembly segment on the mobile launcher for the SLS (Space Launch Syste…
Artemis III Booster Stacking Coverage - LAC Mated
Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kenne…
Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2
Technicians assist a crane to lower a pair of International Space Station Roll Out Solar Arrays (iROSA) onto a platform on Tuesday, Aug. 11, 2026, inside the Space Systems Processing Facility at NASA’s Kennedy Space Center in Florida. The i…
IROSA Lift for Transport
Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kenne…
Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2
Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kenne…
Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2
Technicians prepare the #2 RS-25 SLS (Space Launch System) rocket engine for transfer onto a work stand ahead of integration with the Artemis III core stage rocket on Tuesday, Aug. 25, 2026, inside the Vehicle Assembly Building at NASA’s Ke…
Artemis III RS-25 Engine Processing: #3 Lift
In High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the left aft center booster segment for Artemis III is integrated onto its aft assembly segment on the mobile launcher for the SLS (Space Launch Syste…
Artemis III Booster Stacking Coverage - LAC Mated
Technicians lift and transfer the #2 RS-25 SLS (Space Launch System) rocket engine (back) to the work stand. Visible in the foreground is the #3 engine already integrated with the Artemis III core stage rocket on Tuesday, Aug. 25, 2026, ins…
Artemis III RS-25 Engine Processing: #3 Lift
Artemis launch team members participate in a cryogenic propellant loading simulation for NASA’s Artemis III mission on Wednesday, Sept. 9, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at the agency’s Kenne…
Artemis III Launch Simulation, Cryo Sim, LCC Firing Rooms 1 & 2
In High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the left aft center booster segment for Artemis III is integrated onto its aft assembly segment on the mobile launcher for the SLS (Space Launch Syste…
Artemis III Booster Stacking Coverage - LAC Mated