European Space Agency's Biorack incubator (37deg C)
ARC-1996-AC96-0139-5
European Space Agency's Biorack incubator A (22deg C)
ARC-1996-AC96-0139-4
European Space Agency's Biorack middeck lockers
ARC-1996-AC96-0139-11
SPACE SHUTTLE ORBITER ENTERPRISE MATED TO AN EXTERNAL FUEL TANK AND TWO SOLID ROCKET BOOSTERS ON TOP OF A MOBIL LAUNCHER PLATFORM, UNDERGOES FIT AND FUNCTION CHECKS AT THE LAUNCH SITE FOR THE FIRST SPACE SHUTTLE AT LAUNCH COMPLEX 39'S PAD A…
ARC-1980-AC80-0107-14
Space Shuttle cutaway showing astronauts working with ESA Spacelab
ARC-1980-AC80-0107-1
The payload bay doors of the Space Shuttle Orbiter Columbia were opened for the first time today using the orbiter's onboard door operation system. The hinges of the payload bay doors are not designed to support the weight of the doors whil…
ARC-1980-AC80-0107-6
ROCKWELL INTERNATIONAL TECHNICIANS MOUNT SOME OF THE NEARLY 8,000 CERAMIC-COATED TILES THAT REMAIN TO BE INSTALLED ON THE EXTERNAL SURFACES OF THE SPACE SHUTTLE ORBITER COLUMBIA TO COMPLETE THE THERMAL PROTECTION SYSTEM THAT WILL ABSORB THE…
ARC-1980-AC80-0107-8
Launch of space shuttle Atlantis STS-122
08pd0222
European Space Agency's Biorack passive thermal conditioning unit (PTCU)
ARC-1996-AC96-0139-13
Launch of space shuttle Atlantis STS-122
08pd0215
European Space Agency's Biorack incubator C (37deg C)
ARC-1996-AC96-0139-10
European Space Agency's Biorack facility
ARC-1996-AC96-0139-1
Launch of space shuttle Atlantis STS-122
08pd0219
Launch of space shuttle Atlantis STS-122
08pd0221
European Space Agency's Biorack MLSI (middeck locker stowage insert)
ARC-1996-AC96-0139-7
A pre launch view of Pioneer-10 (or F) spacecraft encapsulated and mated with a Atlas-Centaura launch vehicle in preparation for mission to Jupiter
ARC-1972-AC72-2139
European Space Agency's Biorack MLSI (middeck locker stowage insert)
ARC-1996-AC96-0139-9
Endeavour's payload bay is open for payload configuration work in Orbiter Processing Facility bay 2. The orbiter is the vehicle designated for mission STS-118, scheduled to launch in late June. The mission will continue space station constr…
Shuttle Bay doors opened in OPF
Workers painting the Flag and Meatball on the VAB.
Workers painting the Flag and Meatball on the VAB
Launch of Pioneer 10 to Jupiter occured at 8:49 p.m. EST  March 2, 1972
ARC-1972-AC72-2142
European Space Agency's Biorack incubator A (22deg C)
ARC-1996-AC96-0139-3
SPACE SHUTTLE ORBITER ENTERPRISE MATED TO AN EXTERNAL FUEL TANK AND TWO SOLID ROCKET BOOSTERS ON TOP OF A MOBIL LAUNCHER PLATFORM, UNDERGOES FIT AND FUNCTION CHECKS AT THE LAUNCH SITE FOR THE FIRST SPACE SHUTTLE AT LAUNCH COMPLEX 39'S PAD A…
ARC-1980-AC80-0107-17
Pioneer-10 (or F) spacecraft encapsulated and moving to pad at Cape Kennedy for matting with a Atlas-Centaura launch vehicle in preparation for mission to Jupiter
ARC-1972-AC72-2138
European Space Agency's Biorack MLSI (middeck locker stowage insert) for PTCU
ARC-1996-AC96-0139-8
Launch of space shuttle Atlantis STS-122
08pd0214
Launch of space shuttle Atlantis STS-122
08pd0224
ROCKWELL INTERNATIONAL TECHNICIANS MOUNT SOME OF THE NEARLY 8,000 CERAMIC-COATED TILES THAT REMAIN TO BE INSTALLED ON THE EXTERNAL SURFACES OF THE SPACE SHUTTLE ORBITER COLUMBIA TO COMPLETE THE THERMAL PROTECTION SYSTEM THAT WILL ABSORB THE…
ARC-1980-AC80-0107-9
Launch of space shuttle Atlantis STS-122
08pd0216
Space Shuttle Columbia at Launch Site. (ref: 81-HC-1)
ARC-1981-AC81-0083-1
Launch of space shuttle Atlantis STS-122
08pd0220
A pre launch view of Pioneer-10 (or F) spacecraft encapsulated and mated with a Atlas-Centaura launch vehicle in preparation for mission to Jupiter
ARC-1972-AC72-2140
Outfitting the Space Shuttle Orbiter Columbia with the three main rocket engines that will boost the 75 ton spacecraft into orbit on its first flight is completed with the installation of Engine #2007 (top). At liftoff, each engine will be…
ARC-1980-AC80-0107-4
Space Shuttle Orbiter Enterprise is lowered to the floor of the transfer aisle in the Vehicle Assembly Building during destacking operations.  The Enterprise, mated to an external tank and twin inert solid rocket boosters, formed a nonlaunc…
ARC-1980-AC80-0107-13
Space Shuttle Orbiter Enterprise, mated to a 15-story-tall external propellant tank and twin inert solid rocket boosters on top of a Mobile Launcher Platform, is rolled back to the Vehicle Assembly Building from Lauch Complex 39's Pad A Jul…
ARC-1980-AC80-0107-18
Launch of space shuttle Atlantis STS-122
08pd0218
Launch of space shuttle Atlantis STS-122
08pd0211
Launch of space shuttle Atlantis STS-122
08pd0212
Space Shuttle Columbia at Launch Site. (ref: 81-HC-5)
ARC-1981-AC81-0083-2
European Space Agency's Biorack passive thermal conditioning unit (PTCU)
ARC-1996-AC96-0139-12
Launch of space shuttle Atlantis STS-122
08pd0209
Launch of space shuttle Atlantis STS-122
08pd0217
STS120-S-028 (23 Oct. 2007) --- The Space Shuttle Discovery and its seven-member STS-120 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred…
STS-120 launch
The 747 Shuttle Carrier Aircraft, carrying the Space Shuttle Orbiter Enterprise piggyback, lifts off from the Shuttle Landing Facility's 15,000-foot-long runway at 11:03, August 10.  Enterprise flown to KSC on April 10 for use in checking o…
ARC-1980-AC80-0107-7
STS120-S-031 (23 Oct. 2007) --- The Space Shuttle Discovery and its seven-member STS-120 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred…
STS-120 launch
European Space Agency's Biorack glovebox
ARC-1996-AC96-0139-6
European Space Agency's Biorack facility
ARC-1996-AC96-0139-2
The Space Shuttle Orbiter Enterprise is lowered to the floor of the transfer aisle in the Vehicle Assembly Building during destacking operations. The Enterprise, mated to an external tank and twin inert solid rocket boosters, formed a nonla…
ARC-1980-AC80-0107-12
Endeavour's payload bay is open for payload configuration work in Orbiter Processing Facility bay 2. The orbiter is the vehicle designated for mission STS-118, scheduled to launch in late June. The mission will continue space station constr…
Shuttle Bay doors opened in OPF