In the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, Tristan Bremner, a launch vehicle technician with Jacobs, helps secure the second of two Artemis I aft booster segments for the Space Launch System onto the m…
SLS Artemis I Aft Segment Stacking
Members of the media get an up-close look at the SLS (Space Launch System) rocket core stage for Artemis II inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida during Artemis Media Day on Friday, March 7, 2025. Th…
Artemis Media Day
The mobile launcher with NASA’s Space Launch System (SLS) rocket and Orion spacecraft rolls out of the Vehicle Assembly Building’s High Bay 3 to Launch Complex 39B on Tuesday, Aug. 16, 2022, at NASA’s Kennedy Space Center in Florida. As par…
Artemis I Launch Rollout
NASA’s SLS (Space Launch System) core stage for the Artemis III mission undergoes prelaunch processing inside High Bay 2 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Tuesday, May 12, 2026. This marks the fir…
Commercial Crew-13 Astronauts in VAB
A SpaceX Falcon Heavy rocket begins its demonstration flight with liftoff at 3:45 p.m. EST from from Launch Complex 39A at NASA's Kennedy Space Center in Florida. This is a significant milestone for the world's premier multi-user spaceport.…
SpaceX Falcon Heavy Demo Flight - Liftoff
A construction worker wearing a safety harness and tethered lines prepares to assist with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assemb…
Platform B North Installation
A heavy load transport truck from Tillett Heavy Hauling in Titusville, Florida, arrives at NASA’s Kennedy Space Center in Florida, carrying the first half of the A-level work platforms, A south, for the agency’s Space Launch System (SLS) ro…
Platform A South Arrival
A section of the second half of the C-level platforms, C North, for NASA’s Space Launch System (SLS) rocket, arrives at the agency’s Kennedy Space Center in Florida. The platform was offloaded from a heavy lift transport truck and secured i…
Platform C North Arrival
Painting of the NASA logo, also called the meatball, continues on the 525-foot-tall Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida on June 23, 2020. HM2 and H.I.S. Painting of Titusville, Florida, are repain…
VAB Painting
During a training exercise, technicians with NASA’s Exploration Ground Systems lower a mock-up of the Space Launch System (SLS) aft booster segment, referred to as a pathfinder, onto the mobile launcher in Kennedy Space Center’s Vehicle Ass…
Artemis SLS Booster Stacking Practice on ML
Engineers with NASA’s Exploration Ground Systems integrate the aerodynamic nose cone onto the left-hand forward assembly on the twin SLS (Space Launch System) solid rocket boosters for Artemis II inside the Vehicle Assembly Building’s High…
Artemis II Stacking Nose Cone LH mate
Teams with NASA’s Exploration Ground Systems and contractor Jacobs prepare to lift the Space Launch System (SLS) core stage and transfer it over to High Bay 3 in the Vehicle Assembly Building, where it will be placed atop the mobile launche…
Artemis I SLS Core Stage Prep for Lift/Mate
The left-hand and right-hand aft assembly solid rocket booster segments for NASA’s Artemis III SLS (Space Launch System) rocket are secured to the mobile launcher at the agency’s Vehicle Assembly Building at NASA’s Kennedy Space Center in F…
Artemis III Booster Stacking Coverage
NASA astronaut Victor Glover stands inside Kennedy Space Center’s Vehicle Assembly Building on July 15, 2021, near the agency’s Space Launch System (SLS) rocket that will power the Orion spacecraft on the Artemis I mission later this year.…
Victor Glover Tours VAB
Workers prepare to unload the second half of the A-level work platforms, A north, for NASA's Space Launch System (SLS) rocket, from a heavy load transport truck in a staging area near the Vehicle Assembly Building (VAB) at NASA's Kennedy Sp…
Platform A North Arrival
Teams from NASA’s Kennedy Space Center in Florida transport the agency’s Artemis III SLS (Space Launch System) core stage boat-tail from the spaceport's Space Systems Processing Facility to the Vehicle Assembly Building on Thursday, July 24…
Engine Section 3 Artemis
A Common Gallinule wades in a waterway at NASA’s Kennedy Space Center in Florida on June 22, 2020. The center shares a border with the Merritt Island National Wildlife Refuge. More than 330 native and migratory bird species, along with 25 m…
VAB Painting and Nature
Kennedy Space Center Director Bob Cabana points to a display during a tour for cast and crew members of the upcoming motion picture "Hidden Figures." The group is walking thought the transfer aisle of the Vehicle Assembly Building. The movi…
"Hidden Figures" Tour KSC
All work platforms are retracted from around NASA’s Artemis II SLS (Space Launch System) rocket and Orion spacecraft, secured to the mobile launcher, inside the Vehicle Assembly Building on Thursday, March 19, 2026, in preparation for rollo…
Artemis II Rollout For Launch
The Space Launch System (SLS) rocket’s interim cryogenic propulsion stage (ICPS) is moved into the transfer aisle of the Vehicle Assembly Building (VAB) by teams with NASA’s Exploration Ground Systems and contractor Jacobs at NASA’s Kennedy…
Artemis I ICPS Arrival at VAB
NASA’s Artemis II Orion spacecraft with its launch abort system is stacked atop the agency’s SLS (Space Launch System) rocket in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Monday, Oct. 20, 2025.…
Orion and Artemis II Integration
NASA’s Space Launch System (SLS) rocket, with the Orion capsule atop, slowly makes its way along the crawlerway at the agency’s Kennedy Space Center in Florida on Tuesday, Aug. 16, 2022/Wednesday, Aug. 17, 2022. Carried atop the crawler-tra…
Artemis I Launch Rollout
Kennedy Space Center Director Bob Cabana, far right, accompanies Russell Vought, second from right, director of the White House Office of Management and Budget, and NASA Administrator Jim Bridenstine, far left, on a tour of the Vehicle Asse…
OMB Director and Bridenstine Visit
From left, NASA astronaut Reid Wiseman, Artemis II commander; NASA astronaut Victor Glover, Artemis II pilot; and CSA (Canadian Space Agency) astronaut Jenni Gibbons, Artemis II backup crew member, participate in emergency egress training w…
Artemis II Flight Crew VAB Walkthrough
Sam Dove, crawler-transporter operations engineer and driver, Jacobs Engineering, is seen inside the operator cab of the crawler-transporter during rollout operations for NASA’s Space Launch System and Orion spacecraft at the agency’s Kenne…
Artemis I Launch Rollout
High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the final work platform, A north, for installation in High Bay 3. The platform will be installed and secured on its rail beam high up o…
Platform A North Installation
A new service platform for NASA's Space Launch System booster engines, secured on a flatbed truck, has arrived at the Vehicle Assembly Building (VAB) at the agency's Kennedy Space Center in Florida. It was transported from fabricator Met-Co…
Booster Engine Service Platforms Delivered to VAB
Teams with NASA’s Exploration Ground Systems and contractor Jacobs rotate the Space Launch System (SLS) core stage – the largest part of the rocket – into a vertical position in preparation for its move to High Bay 3 in the Vehicle Assembly…
Artemis I SLS Core Stage Prep for Lift/Mate
With all of the work platforms retracted, NASA’s Space Launch System and Orion spacecraft atop the mobile launcher are in view in High Bay 3 of the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on June 3, 2022. T…
Crawler Transporter 2 Roll into VAB for Artemis I WDR Rollout &
In this view looking down inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on March 11, 2022, the work platforms are being retracted from around the Artemis I Space Launch System rocket and Orion spacecraft in…
Artemis I WDR Pre-Rollout Activities - Platforms Retracted
Dick Bergmann, at right, original lead designer for the Vehicle Assembly Building, stands on the roof of the iconic facility during a tour on Nov. 22, 2019 at NASA’s Kennedy Space Center in Florida. The VAB was recognized with the National…
VAB Architects Tour Historic Building
Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, is lowered into position for installation on the north side…
Platform C North Installation
Teams from NASA’s Kennedy Space Center in Florida integrate NASA’s Artemis III SLS (Space Launch System) core stage engine section with its boat-tail inside the spaceport’s Vehicle Assembly Building on Wednesday, July 30, 2025. The boat-tai…
Artemis III Engine Section Boat Tail
Engineers with NASA’s Exploration Ground Systems complete stacking operations on the twin SLS (Space Launch System) solid rocket boosters for Artemis II by integrating the nose cones atop the forward assemblies inside the Vehicle Assembly B…
Artemis II Stacking Final Nose Cone
Teams with NASA’s Exploration Ground Systems and contractor Jacobs lift the Space Launch System (SLS) core stage – the largest part of the rocket – and prepare to move it over to High Bay 3 in the Vehicle Assembly Building, where it will be…
Artemis I SLS Core Stage Prep for Lift/Mate
Workers transport NASA’s IMAP (Interstellar Mapping and Acceleration Probe) spacecraft along with the agency’s Carruthers Geocorona Observatory and National Oceanic and Atmospheric Administration’s (NOAA) Space Weather Follow On–Lagrange 1…
IMAP Transport to Launch Pad
Technicians install three of four RS-25 SLS (Space Launch System) rocket engines on the work stand for integration with the Artemis III core stage rocket on Friday, Aug. 28, 2026, inside the Vehicle Assembly Building at NASA’s Kennedy Space…
Artemis III RS-25 Engines installed
The right-hand aft assembly solid rocket booster segment for NASA’s Artemis III SLS (Space Launch System) rocket arrives at the agency’s Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Thursday, July 9, 2026, ahead of…
Artemis III Booster Stacking Coverage - RH Aft Assembly
NASA’s Artemis II SLS (Space Launch System) rocket and Orion spacecraft, secured to the mobile launcher, prepares to roll out from the Vehicle Assembly Building to Launch Complex 39B at NASA’s Kennedy Space Center in Florida on Saturday, Ja…
Artemis II Rollout
Painting of the NASA logo, also called the meatball, continues on the 525-foot-tall Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida on June 23, 2020. HM2 and H.I.S. Painting of Titusville, Florida, are repain…
VAB Painting
During a training exercise, technicians with NASA’s Exploration Ground Systems lower a mock-up of the Space Launch System (SLS) aft booster segment, referred to as a pathfinder, onto the mobile launcher in Kennedy Space Center’s Vehicle Ass…
Artemis SLS Booster Stacking Practice on ML
High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, for installation in High Bay 3. Th…
Platform B North Installation
Students in the My Brother’s Keeper program get an inside look at NASA Kennedy Space Center’s iconic Vehicle Assembly Building from the transfer aisle. The Florida spaceport is one of six NASA centers that participated in My Brother’s Keepe…
My Brother’s Keeper National Lab Week
An engineer adjusts equipment from the Design Visualization Lab set up inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center on Oct. 14, 2020. The equipment will be used to do 3-D modeling of the mobile launcher…
Engineering Labs - Design Viz Labs
A heavy load transport truck from Tillett Heavy Hauling in Titusville, Florida, arrives at the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, carrying the first half of the A-level work platforms, A south, for th…
Platform A South Arrival
Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the engine service platform that will provide access to the core stage of the Space Launch System (SLS) rocket is lifted up in the center of the mobile launcher…
Core Stage Engine Platform Installation on Mobile Launcher
A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Flor…
Platform B South Installation
In High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the right-hand forward segment is lowered by crane on top of the center forward segment on the mobile launcher (ML) for the Space Launch System (SLS)…
Artemis I LH and RH Forward Assemblies Complete