In Orbiter Processing Facility bay 2, technicians on a Hyster forklift maneuver space shuttle main engine no. 3 into place on Endeavour. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter…
Space Shuttle Main Engine 3 install in Endeavor
In Orbiter Processing Facility bay 2, technicians Jesus Rodrigues (left) and James Johnson install a leading edge subsystem carrier panel on the right wing of Endeavour. The orbiter is scheduled for mission STS-118, targeted for launch on J…
Installing a Carrier Panel on Endeavor in OPF 2
T&R/Endeavour Fuel Cells Removed
2012-3104
Discovery T & R, Oms Pod Rotate for Removal
2011-3015
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2432
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2422
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2430
T&R/Endeavour Fuel Cells Removed
2012-3107
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2392
Discovery T & R, Oms Pod Rotate for Removal
2011-3016
T & R Discovery, Right OMS Pod Removal
2011-3026
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
T&R/Endeavour Final Power Down
2012-2741
STS-133 ENDEAVOUR TIRES AND BRAKES REMOVAL
2010-2003
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2395
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2400
In Orbiter Processing Facility bay 2, technicians on a Hyster forklift maneuver space shuttle main engine no. 3 into place on Endeavour. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter…
Space Shuttle Main Engine 3 install in Endeavor
In Orbiter Processing Facility bay 2, technicians on a Hyster forklift install space shuttle main engine no. 3 into Endeavour. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter at the end…
Space Shuttle Main Engine 3 install in Endeavor
T&R Endeavour Airlock Removal
2012-2502
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2433
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2397
T&R/Endeavour Final Power Down
2012-2736
Discovery T & R, Oms Pod Rotate for Removal
2011-3014
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2428
T & R Discovery, Right OMS Pod Removal
2011-3027
T&R Endeavour Airlock Removal
2012-2498
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2425
T&R Endeavour Airlock Removal
2012-2501
T&R Endeavour Airlock Removal
2012-2500
Discovery T & R, Oms Pod Rotate for Removal
2011-3018
In Orbiter Processing Facility bay 2, technicians James Johnson (left) and Jesus Rodrigues install a leading edge subsystem carrier panel on the right wing of Endeavour. The orbiter is scheduled for mission STS-118, targeted for launch on J…
Installing a Carrier Panel on Endeavor in OPF 2
STS-133 ENDEAVOUR TIRES AND BRAKES REMOVAL
2010-1999
STS-133 ENDEAVOUR TIRES AND BRAKES REMOVAL
2010-2001
T&R Endeavour Airlock Removal
2012-2495
T & R Discovery, Right OMS Pod Removal
2011-3030
T & R Discovery, Right OMS Pod Removal
2011-3031
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
T&R/Endeavour Fuel Cells Removed
2012-3108
T & R Discovery, Right OMS Pod Removal
2011-3024
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2429
T&R/Endeavour Final Power Down
2012-2735
T&R/Endeavour Final Power Down
2012-2739
T&R Endeavour Airlock Removal
2012-2505
T&R Endeavour Airlock Removal
2012-2499
T & R Discovery, Right OMS Pod Removal
2011-3029