Endeavour's payload bay is open for payload configuration work in Orbiter Processing Facility bay 2. The orbiter is the vehicle designated for mission STS-118, scheduled to launch in late June. The mission will continue space station constr…
Shuttle Bay doors opened in OPF
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1839
T&R Atlantis Engine 3 Removal
2011-6520
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1843
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1841
T&R Atlantis Engine 3 Removal
2011-6528
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1844
T&R Atlantis Engine 3 Removal
2011-6521
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1833
STS-132 CREW CEIT - ATLANTIS
2010-2289
STS-135 Orbiter & Payload CEIT
2011-2778
T&R Atlantis Final Engine Removal
2011-6538
STS-132 ATLANTIS SSME-1 FINAL RIGHT HAND SHIELD INSTLN BEFORE DOME INSTLN
2010-2027
Shuttle Program Manager Bill Parsons, right, is briefed on Orbiter Major Modifications (OMM) that were recently completed on Discovery. From left are a Boeing representative; Bill Pickavance, vice president and deputy program manager, Flori…
Bill Parsons with Discovery Processing Team
T&R/Atlantis FRCS Installation
2012-3097
Endeavour's payload bay is open for payload configuration work in Orbiter Processing Facility bay 2. The orbiter is the vehicle designated for mission STS-118, scheduled to launch in late June. The mission will continue space station constr…
Shuttle Bay doors opened in OPF
In Orbiter Processing Facility bay 2, technicians on a Hyster forklift maneuver space shuttle main engine no. 3 into place on Endeavour. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter…
Space Shuttle Main Engine 3 install in Endeavor
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1830
In Orbiter Processing Facility bay 2, technicians on a Hyster forklift maneuver space shuttle main engine no. 3 into place on Endeavour. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter…
Space Shuttle Main Engine 3 install in Endeavor
T&R Atlantis Engine 3 Removal
2011-6526
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1835
T&R Atlantis Engine 3 Removal
2011-6524
T&R Atlantis Engine 3 Removal
2011-6519
T&R Atlantis Engine 3 Removal
2011-6525
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1837
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1842
STS-132 ATLANTIS BASE PLATE/SALAD BOWL INSTALLATION
2010-1908
STS-335 STS-135 ATLANTIS ENGINE #1 INSTALLATION
2010-5787
T&R/Endeavour Fuel Cells Removed
2012-3104
In the Orbiter Processing Facility, the nose cap (foreground) removed from Atlantis (behind) waits to be shipped to the original manufacturing company, Vought in Ft. Worth, Texas, a subsidiary of Lockheed Martin, to undergo non-destructive…
Atlantis Non-destructive Testing
Discovery T&R Removal of Heat Shield Around Engine #3
2011-2417
Endeavour's payload bay is open for payload configuration work in Orbiter Processing Facility bay 2. The orbiter is the vehicle designated for mission STS-118, scheduled to launch in late June. The mission will continue space station constr…
Shuttle Bay doors opened in OPF
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1834
T&R Atlantis Engine 3 Removal
2011-6517
T&R Atlantis Engine 3 Removal
2011-6522
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1831
In Orbiter Processing Facility bay 2, technicians James Johnson (left) and Jesus Rodrigues install a leading edge subsystem carrier panel on the right wing of Endeavour. The orbiter is scheduled for mission STS-118, targeted for launch on J…
Installing a Carrier Panel on Endeavor in OPF 2
T&R Atlantis Engine 3 Removal
2011-6523
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1840
In Orbiter Processing Facility bay 2, technicians Jesus Rodrigues (left) and James Johnson install a leading edge subsystem carrier panel on the right wing of Endeavour. The orbiter is scheduled for mission STS-118, targeted for launch on J…
Installing a Carrier Panel on Endeavor in OPF 2
T&R Endeavour, LH Oms Pod Lift and Move for Installation
2012-1836
In Orbiter Processing Facility bay 2, technicians on a Hyster forklift install space shuttle main engine no. 3 into Endeavour. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter at the end…
Space Shuttle Main Engine 3 install in Endeavor
Discovery T&R Removal of Heat Shield Around Engine #3
2011-2421
T&R/Atlantis - Weight and CG in Preparation for Roll to VAB
2012-3555
STS-133 ENDEAVOUR TIRES AND BRAKES REMOVAL
2010-1999
STS-132 ATLANTIS - CHIN STRAP INSTALLATION
2010-1245
STS-131 DISCOVERY ROLLOVER FROM OPF-3 TO VAB
CARD 2 OF 2
T&R Discovery Orbiter Access Hatch Final Closure
2012-1535