Crew members of space shuttle mission STS-120 prepare to board the bus that will transport them to Launch Pad 39A.
STS-120 Crew Walkout from O&C for TCDT
NASA astronaut Christina Koch, Artemis II mission specialist, smiles during suit-up operations inside the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Monday, Aug. 11, 2025. During a two-da…
Artemis II Crew Suiting and Walkout
NASA SpaceX’s Crew-1 astronauts board two Tesla vehicles for the trip to Launch Complex 39A after emerging from the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Nov. 15, 2020. NASA astronauts…
SpaceX Crew-1 Astronaut Walkout
Technicians with NASA and Lockheed Martin operate a 30-ton crane to move NASA’s Artemis II Orion spacecraft out of the Final Assembly and System Testing cell inside the Neil A. Operations and Checkout Building at NASA’s Kennedy Space Center…
Artemis II Orion Lift Pre Saw Installation
The Orion pressure vessel for Exploration Mission-2 (EM-2) is inside processing equipment where it is getting where it is getting initial processing done.
EM-2 Pressure Vessel in Bird Cage in the O&C
Teams inside the Operations and Checkout building at NASA’s Kennedy Space Center in Florida on Thursday, Feb. 1, 2024, work on the Orion spacecraft crew module  that will carry the Artemis II astronauts on their 10-day journey around the Mo…
Artemis II Orion Hardware
The Orion pressure vessel for NASA’s Artemis ll mission is in view in a processing stand inside the Neil Armstrong Operations and Checkout Building high bay on Sept. 17, 2019. Orion is being prepared for the first crewed test flight atop th…
Artemis I and II Production Updates
NASA astronaut Zena Cardman signs her name next to NASA’s SpaceX Crew-11 mission logo inside the Astronaut Crew Quarters in the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Monday, July 28,…
Crew-11_Sign their mission patch on the wall
A Black History Month celebration was held on Feb. 18, 2020 at NASA’s Kennedy Space Center in Florida. The program was organized by the Black Employee Strategy Team (BEST), one of the center’s employee resource groups. This year’s theme was…
Black History Month Event
Inside the airlock in the Neil Armstrong Operations and Checkout Building high bay On Nov. 6, 2018, European Space Agency (ESA) and Airbus engineers and technicians watch as a crane is used to uncrate the ESA's European Service Module (ESM)…
Orion EM-1 European Service Module Uncrating
Evan Bell, a mechanical engineer and member of the Gaseous Lunar Oxygen from Regolith Electrolysis (GaLORE) project team at NASA’s Kennedy Space Center in Florida, checks the hardware that will be used to melt lunar regolith – dirt and dust…
GALORE Testing - Regolith Melt Testing
Inside the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida, the Artemis II crew module adapter (CMA) is being relocated from the clean room to the Pressure Proof Cell for additional testing and main…
Artemis II Crew Module Adapter Move to Clean Room
During a Black History Month celebration on Feb. 18, 2020 at NASA’s Kennedy Space Center in Florida, Hortense Diggs, at the podium, director of Communication and Public Engagement, commemorates the contributions of former NASA employee and…
Black History Month Event
Kevin Grossman, project lead for the Gaseous Lunar Oxygen from Regolith Electrolysis (GaLORE) project at NASA Kennedy Space Center’s Swamp Works, inspects a piece of hardware for GaLORE on July 21, 2020, inside a laboratory at the center’s…
Exploration Research and Technology Lab Work - Kevin Grossman, G
Orion is revealed for one of the final times on Jan. 14, as it is readied atop its transport pallet from the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, along its path to the pad ahead of the A…
Artemis I Orion Lift to Transporter - Kathy Lueders Tour
A transporter carrying the Orion crew module structural test article (STA) in its container arrives at the low bay entrance of the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The STA arrived ab…
Orion Crew Module Structural Test Article Transport from SLF to
From right to left, NASA’s SpaceX Crew-11 crew members JAXA (Japan Aerospace Exploration Agency) astronaut Kimiya Yui, along with NASA astronauts Zena Cardman and Mike Fincke, as well as Roscosmos cosmonaut Oleg Platonov pose for a photo in…
Crew-11 Prelaunch Dry Dress Rehearsal
Members of the ESA (European Space Agency) leadership team and NASA Orion program team stand by European Service Module with the Orion spacecraft in the background for NASA’s Artemis III mission on Tuesday, Feb. 10, 2026, inside the high ba…
ESA IOZ Tour O&C High Bay
Inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, Lockheed Martin technicians attach lines from a crane to the Orion crew module structural test article (STA). The STA arrived aboard NASA'…
Orion EM-1 Crew Module Structural Test Article Move to Birdcage
Inside the Operations and Checkout building at NASA's Kennedy Space Center in Florida on Thursday, Feb. 1, 2024, backshell panels and insulation for the Artemis II Orion spacecraft’s exterior are prepped for install. The spacecraft’s exteri…
Artemis II Orion Hardware
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, assembly continues on Orion’s Artemis II crew module on Feb. 5, 2021. The capsule will house astronauts during its mission around…
Artemis II Crew Module Current Status
Srujana Neelam, a researcher working at NASA’s Kennedy Space Center in Florida, dissects Arabidopsis thaliana plants from petri plates used in microgravity simulation devices in the Microgravity Simulation Support Facility (MSSF) inside the…
Microgravity Simulation Support Facility
The Artemis I Orion spacecraft is lowered by crane into the FAST cell after installation of the spacecraft adapter (SA) cone was completed inside the Neil Armstrong Operations and Checkout Building on Aug. 20, 2020. This is one of the final…
Orion Spacecraft Adapter (SA) Cone Install
JAXA (Japan Aerospace Exploration Agency) astronaut Takuya Onishi is photographed in his SpaceX spacesuit inside the crew suit-up room in the Neil A. Armstrong Operations and Checkout Building at the agency’s Kennedy Space Center in Florida…
SpaceX Crew-10 Astronaut Suit Up
The cover of the shipping container carrying the heat shield for Orion’s Artemis 2 mission, NASA’s first crewed mission, is lifted up inside the Neil Armstrong Operations and Checkout Building high bay at the agency’s Kennedy Space Center i…
Artemis-2 Heat Shield Arrival
NASA astronaut Victor Glover stands inside Kennedy Space Center’s Neil A. Armstrong Operations and Checkout Building on July 15, 2021, near the crew module for the agency’s Artemis II mission. Artemis will lay the foundation for a sustained…
Victor Glover Tours O&C
Patrick Follis, an intern at NASA’s Kennedy Space Center in Florida, assembles the flight hardware for the agency’s Orbital Syngas Commodity Augmentation Reactor, or OSCAR. OSCAR is an Early Career Initiative project at the spaceport that s…
Orbital Syngas Commodity Augmentation Reactor (OSCAR) Flight Har
NASA’s SpaceX Crew-6 crewmembers participate in final fit checks of their SpaceX spacesuits in the crew suit-up room inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on March 1, 2023. In v…
NASA’s SpaceX Crew-6 Launch - Astronauts Suit-Up and Walkout a
The Orion pressure vessel for NASA’s Artemis ll mission is in a processing stand inside the Neil Armstrong Operations and Checkout Building high bay on Sept. 17, 2019. Orion is being prepared for the first crewed test flight atop the agency…
Artemis I and II Production Updates
A flatbed truck with the shipping container carrying the heat shield for Orion’s Artemis 2 mission, NASA’s first crewed mission, arrives at the Neil Armstrong Operations and Checkout Building high bay entrance at the agency’s Kennedy Space…
Artemis-2 Heat Shield Arrival
The European-built Service Module (ESM) for NASA’s Artemis II mission is shown in a work stand inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Oct. 15, 2021. Teams f…
Artemis II - European Service Module Arrival at KSC - on Work St
Inside the Microbiology Lab at NASA’s Kennedy Space Center in Florida on Oct. 6, 2021, Microbiology Lead Mary Hummerick works with frozen lettuce samples that recently returned from the International Space Station as part of NASA’s SpaceX 2…
VEG-03
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, a protective cover is installed around the Orion crew module adapter (CMA) for Exploration Mission 1 (EM-1) for its move to a cle…
Orion EM-1 Crew Module Adapter Move to Clean Room
Preparations are underway to lift the European Service Module (ESM) for NASA’s Artemis II mission by crane inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on May 22, 20…
Artemis II SM Move to Fast Cell
The European Service Module (ESM) for NASA’s Artemis II mission is secured inside the FAST (final assembly and system testing) cell in the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in…
Artemis II SM Move to Fast Cell
Jeffrey Richards, a project science coordinator working with the Exploration Research and Technology programs at NASA’s Kennedy Space Center in Florida, prepares containers Feb. 11, 2021, for a Materials International Space Station Experime…
MISSE Seed Experiment Work
NASA and contractor workers attend a Black History Month celebration at Kennedy Space Center in Florida on Feb. 18, 2020. James Jennings, former NASA associate administrator for Institutions and Management and former Kennedy Space Center de…
Black History Month Event
Catherine Koerner, at left, NASA Orion Program manager, along with senior managers from Orion and Lockheed Martin, tours the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Oct. 6, 2020. Accompan…
Cathy Koerner KSC Visit - O&C
A Gravite 3d clinostat is in the Microgravity Simulation Support Facility (MSSF) inside the Neil Armstrong Operations and Checkout building at NASA’s Kennedy Space Center in Florida on Feb. 11, 2020. The facility was developed to provide gr…
Microgravity Simulation Support Facility
NASA astronaut Reid Wiseman, Artemis II commander, undergoes spacesuit checks inside the crew quarters suit-up room in the Neil A. Armstrong Operations and Checkout Building part of the Artemis II Countdown Demonstration Test at the agency’…
Artemis II CDDT - Suit Up and Walkout
NASA astronaut Christina Koch, Artemis II mission specialist, conducts leak checks on her spacesuit inside the crew suit-up room in the Neil A. Armstrong Operations and Checkout Building at the agency’s Kennedy Space Center in Florida on We…
Artemis II Launch Day, Crew Suit-Up and Walkout
Flight hardware for NASA’s Orbital Syngas Commodity Augmentation Reactor, or OSCAR, is inside the Applied Physics Lab inside the Neil Armstrong Operations and Checkout Facility at the agency’s Kennedy Space Center in Florida on July 21, 202…
OSCAR Testing and Group Photos
Inside the airlock in the Neil Armstrong Operations and Checkout Building high bay On Nov. 6, 2018, a crane is used to uncrate the European Space Agency's European Service Module (ESM) at NASA's Kennedy Space Center in Florida. The ESM will…
Orion EM-1 European Service Module Uncrating
NASA’s SpaceX Crew-10 crew members walk out of the Neil A. Armstrong Operations and Checkout Building at the agency’s Kennedy Space Center in Florida ahead of launch on Wednesday, March 12, 2025. NASA astronauts Nichole Ayers (front, left)…
SpaceX CCP Crew-10 Astronaut Walkout HJallway
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, Lockheed Martin and ASRC engineers and technicians review procedures before preparing the Orion crew module from Exploration Flig…
EFT-1 Crew Module preparations to move to KSC Visitor Complex
Orion is revealed for one of the final times on Jan. 14, as it is readied atop its transport pallet from the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, along its path to the pad ahead of the A…
Artemis I Orion Lift to Transporter - Key Handover from Lockheed
Seen here is the pressure vessel for the Artemis IV mission inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Feb. 21, 2023. The pressure vessel is the underlying structure of the Orion…
Artemis IV Pressure Vessel and Artemis II European Service Modul
Inside the Microbiology Lab at NASA’s Kennedy Space Center in Florida on Oct. 6, 2021, Microbiology Lead Mary Hummerick, left, and Microbiologist Jennifer Gooden work with frozen lettuce samples that recently returned from the International…
VEG-03