THE ORION HEAT SHIELD, WHICH WAS AT NASA’S MARSHALL SPACE FLIGHT CENTER FROM MARCH-MAY 2015 FOR ENGINEERING AND ANALYSIS, IS READIED FOR DEPARTURE AT THE END OF ITS STAY. THE HEAT SHIELD’S ABLATED SURFACE MATERIAL WAS REMOVED AT MARSHALL FO…
Orion Heat Shield Testing
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, a crane lifts the Orion heat shield for Exploration Mission 1 away from the base of its shipping container. The heat shield arriv…
Orion EM-1 Heat Shield Offload, Transport, and Lift
A flatbed truck with the shipping container carrying the Orion heat shield for Exploration Mission 1 (EM-1) arrives at the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida. The heat shield arrived ab…
Orion EM-1 Heat Shield Offload, Transport, and Lift
Technicians with Jacobs on the Test and Operations Support Contract have positioned a platform close to NASA’s Super Guppy aircraft at the Shuttle Landing Facility, managed and operated by Space Florida, at the agency’s Kennedy Space Center…
Orion EM-1 Heat Shield Offload, Transport, and Lift
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, technicians assist as a crane lifts the Orion heat shield for Exploration Mission 1 away from the base of its shipping container.…
Orion EM-1 Heat Shield Offload, Transport, and Lift
Inside the high bay in the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, technicians with Lockheed Martin start to remove the protective covering from the Orion heat shield for Exploration Missio…
Orion EM-1 Heat Shield Unbagging
Inside the high bay in the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, technicians with Lockheed Martin start to remove the protective covering from the Orion heat shield for Exploration Missio…
Orion EM-1 Heat Shield Unbagging
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the AVOCAT block bonding is complete on the Artemis II heat shield on July 2, 2020. The heat shield is one of the most critical e…
Artemis II Heat Shield
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, technician Kenny Leidner with ASRC Federal, inspects AVCOAT block bonding on the Artemis II heat shield on July 2, 2020. The heat…
Artemis II Heat Shield
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the AVOCAT block bonding is complete on the Artemis II heat shield on July 2, 2020. The heat shield is one of the most critical e…
Artemis II Heat Shield
Jennifer Solano, with Lockheed Martin at NASA’s Kennedy Space Center in Florida, demonstrates a pair of augmented reality (AR) goggles as she works on crew module hardware for the agency’s Artemis II mission inside the high bay of the Neil…
Augmented Reality Work on Orion CM Heatshield
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, from left, technicians Diamond ScharSenstine, Kenny Leidner, Russ Novak and Darlene Beville, all with ASRC Federal, inspect AVCOA…
Artemis II Heat Shield
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the AVOCAT block bonding is complete on the Artemis II heat shield on July 2, 2020. The heat shield is one of the most critical e…
Artemis II Heat Shield
THE ORION HEAT SHIELD, WHICH WAS AT NASA’S MARSHALL SPACE FLIGHT CENTER FROM MARCH-MAY 2015 FOR ENGINEERING AND ANALYSIS, IS READIED FOR DEPARTURE AT THE END OF ITS STAY. THE HEAT SHIELD’S ABLATED SURFACE MATERIAL WAS REMOVED AT MARSHALL FO…
Orion Heat Shield Testing
The shipping container carrying the Orion heat shield for Exploration Mission 1 (EM-1) was offloaded from NASA’s Super Guppy aircraft at the Shuttle Landing Facility, managed and operated by Space Florida, at the agency’s Kennedy Space Cent…
Orion EM-1 Heat Shield Offload, Transport, and Lift
Technicians with Jacobs on the Test and Operations Support Contract move a transporter close to NASA’s Super Guppy aircraft at the Shuttle Landing Facility, managed and operated by Space Florida, at the agency’s Kennedy Space Center in Flor…
Orion EM-1 Heat Shield Offload, Transport, and Lift
A flatbed truck with the shipping container carrying the Orion heat shield for Exploration Mission 1 (EM-1) backs into the low bay at the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida. The heat sh…
Orion EM-1 Heat Shield Offload, Transport, and Lift
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, a crane removes the top of the shipping container carrying the Orion heat shield for Exploration Mission 1 (EM-1). The heat shiel…
Orion EM-1 Heat Shield Offload, Transport, and Lift
A flatbed truck with the shipping container carrying the Orion heat shield for Exploration Mission 1 (EM-1) passes by the Vehicle Assembly at NASA’s Kennedy Space Center in Florida. The heat shield arrived aboard the agency’s Super Guppy ai…
Orion EM-1 Heat Shield Offload, Transport, and Lift
The Orion heat shield for Exploration Mission 1 (EM-1) is secured inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida. The heat shield arrived aboard the agency’s Super Guppy aircraf…
Orion EM-1 Heat Shield Offload, Transport, and Lift
The shipping container carrying the Orion heat shield for Exploration Mission 1 (EM-1) is lowered by crane onto the flatbed of a transporter at the Shuttle Landing Facility, managed and operated by Space Florida, at NASA’s Kennedy Space Cen…
Orion EM-1 Heat Shield Offload, Transport, and Lift
The shipping container carrying the Orion heat shield for Exploration Mission 1 (EM-1) is offloaded from NASA’s Super Guppy aircraft at the Shuttle Landing Facility, managed and operated by Space Florida, at the agency’s Kennedy Space Cente…
Orion EM-1 Heat Shield Offload, Transport, and Lift
A view from inside the cargo bay of NASA’s Super Guppy aircraft reveals that the shipping container with the Orion heat shield for Exploration Mission 1 (EM-1) was offloaded at the Shuttle Landing Facility, managed and operated by Space Flo…
Orion EM-1 Heat Shield Offload, Transport, and Lift
Michael Maxwell, with Lockheed Martin’s augmented reality team, wears a pair of augmented reality (AR) goggles to work on the crew module for NASA’s Artemis II mission inside the high bay of the Neil Armstrong Operations and Checkout Buildi…
Augmented Reality Work on Orion CM Heatshield
Jennifer Solano, with Lockheed Martin at Kennedy Space Center in Florida, wears a pair of augmented reality (AR) goggles to work on crew module hardware for NASA’s Artemis II mission inside the high bay of the Neil Armstrong Operations and…
Augmented Reality Work on Orion CM Heatshield
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the AVCOAT block bonding is complete on the Artemis II heat shield on July 2, 2020. The heat shield is one of the most critical e…
Artemis II Heat Shield
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, from left, technicians Kenny Leidner, Diamond ScharSenstine, Russ Novak and Darlene Beville with ASRC Federal, inspect AVOCAT blo…
Artemis II Heat Shield
Michael Maxwell, with Lockheed Martin’s augmented reality team, wears a pair of augmented reality (AR) goggles to work on the crew module for NASA’s Artemis II mission inside the high bay of the Neil Armstrong Operations and Checkout Buildi…
Augmented Reality Work on Orion CM Heatshield
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, technician Kenny Leidner with ASRC Federal, inspects AVCOAT block bonding on the Artemis II heat shield on July 2, 2020. The heat…
Artemis II Heat Shield
Michael Maxwell, with Lockheed Martin’s augmented reality team, wears a pair of augmented reality (AR) goggles to work on the crew module for NASA’s Artemis II mission inside the high bay of the Neil Armstrong Operations and Checkout Buildi…
Augmented Reality Work on Orion CM Heatshield
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, a crane removes the top of the shipping container carrying the Orion heat shield for Exploration Mission 1 (EM-1) The heat shield…
Orion EM-1 Heat Shield Offload, Transport, and Lift
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, a crane lifts the Orion heat shield for Exploration Mission 1 away from the base of its shipping container. The heat shield arriv…
Orion EM-1 Heat Shield Offload, Transport, and Lift
The shipping container carrying the Orion heat shield for Exploration Mission 1 (EM-1) is transported by truck from the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida along the road to the Neil Armstrong Operations and C…
Orion EM-1 Heat Shield Offload, Transport, and Lift
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, a crane lifts the Orion heat shield for Exploration Mission 1 away from the base of its shipping container. The heat shield arriv…
Orion EM-1 Heat Shield Offload, Transport, and Lift
The shipping container carrying the Orion heat shield for Exploration Mission 1 (EM-1) is offloaded from NASA’s Super Guppy aircraft at the Shuttle Landing Facility, managed and operated by Space Florida, at the agency’s Kennedy Space Cente…
Orion EM-1 Heat Shield Offload, Transport, and Lift
Inside the high bay in the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, the protective coverings were removed from the Orion heat shield for Exploration Mission 1 (EM-1). The heat shield arrived…
Orion EM-1 Heat Shield Unbagging
The American flag is in view above the Orion heat shield for Exploration Mission 1 (EM-1) inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida. The heat shield arrived aboard the agen…
Orion EM-1 Heat Shield Offload, Transport, and Lift
A flatbed truck with the shipping container carrying the Orion heat shield for Exploration Mission 1 (EM-1) backs into the low bay at the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida. The heat sh…
Orion EM-1 Heat Shield Offload, Transport, and Lift
The shipping container carrying the Orion heat shield for Exploration Mission 1 (EM-1) is lowered by crane onto the flatbed of a transporter at the Shuttle Landing Facility, managed and operated by Space Florida, at NASA’s Kennedy Space Cen…
Orion EM-1 Heat Shield Offload, Transport, and Lift
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the AVCOAT block bonding is complete on the Artemis II heat shield on July 2, 2020. The heat shield is one of the most critical e…
Artemis II Heat Shield
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, Darlene Beville with ASRC Federal, inspects AVOCAT block bonding on the Artemis II heat shield on July 2, 2020. The heat shield i…
Artemis II Heat Shield
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, technician Diamond ScharSenstine with ASRC Federal, inspects AVCOAT block bonding on the Artemis II heat shield on July 2, 2020.…
Artemis II Heat Shield
The heat shield for NASA’s Artemis II mission is in view inside the Neil Armstrong Operations and Checkout Building at the agency’s Kennedy Space Center in Florida on March 18, 2020. Using augmented reality (AR) goggles, technicians are com…
Augmented Reality Work on Orion CM Heatshield
Michael Maxwell, with Lockheed Martin’s augmented reality team, wears a pair of augmented reality (AR) goggles to work on the crew module for NASA’s Artemis II mission inside the high bay of the Neil Armstrong Operations and Checkout Buildi…
Augmented Reality Work on Orion CM Heatshield
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the AVCOAT block bonding is complete on the Artemis II heat shield on July 2, 2020. The heat shield is one of the most critical e…
Artemis II Heat Shield