Artist concept shows the Tracking and Data Relay Satellite E (TDRS-E) augmenting a sophisticated TDRS system (TDRSS) communications network after deployment during STS-43 from Atlantis, Orbiter Vehicle (OV) 104. TDRS, built by TRW, will be…
Artist concept of the STS-43 Tracking and Data Relay Satellite E (TDRS-E)
S95-08961  (4 APRIL 1995) --- Workers in the Vertical Processing Facility (VPF) oversee and control the lowering of the Inertial Upper Stage (IUS) booster into a work stand for preflight processing.  The IUS will be attached to the Tracking…
STS-70 payload preparation
The free-flying Tracking and Data Relay Satellite-E (TDRS-E), still attached to an Inertial Upper Stage (IUS), was photographed by one of the crewmembers during the STS-43 mission. The TDRS-E was boosted by the IUS into geosynchronous orbit…
Space Shuttle Projects
STS043-601-033 (2 Aug 1991) --- The Tracking and Data Relay Satellite (TDRS-E), is seen almost as a silhouette in this 70mm image.  The TDRS spacecraft was captured on film as it moved away from the earth-orbiting Atlantis a mere six hours…
STS-43 TDRS-E & IUS over the Pacific Ocean after deployment from OV-104's PLB
Artist concept shows the Hubble Space Telescope (HST) placed in orbit above the Earth's distorting layer of atmosphere by Discovery, Orbiter Vehicle (OV) 103, during mission STS-31. Tracking and data relay satellite (TDRS) is visible in the…
Artist concept of the Hubble Space Telescope (HST) after STS-31 deployment
STS029-71-000AE (13-18 March 1989) --- STS-29 onboard view shows Space Shuttle Discovery's payload bay with tracking and data relay satellite D (TDRS-D) in stowed, pre-deployment position. In this head-on view, TDRS-D stowed components incl…
STS-29 tracking and data relay satellite (TDRS) in OV-103's payload bay (PLB)
During STS-26, inertial upper stage (IUS) with the tracking and data relay satellite C (TDRS-C) drifts above Discovery, Orbiter Vehicle (OV) 103, payload bay (PLB) after being positioned in deployment attitude (an angle of 50 degrees) by th…
STS-26 Discovery, Orbiter Vehicle (OV) 103, IUS / TDRS-C deployment
STS054-71-077 (13 Jan 1993) --- The Tracking and Data Relay Satellite (TDRS) quickly moves away from the Space Shuttle Endeavour following deployment on the first day of the six-day mission.  Onboard NASA's newest Shuttle for the six-day mi…
IUS / TDRS-F drifts above the Earth's surface after STS-54 deployment
STS043-72-059 (2 Aug 1991) --- The Tracking and Data Relay Satellite (TDRS-E), leaves the payload bay of the earth-orbiting Atlantis a mere six hours after the Space Shuttle was launched from Pad 39A at Kennedy Space Center, Florida.  TDRS,…
STS-43 TDRS-E / IUS is deployed from OV-104's payload bay (PLB)
S95-08962 (12 APRIL 1995) --- Members of the Kennedy Space Center (KSC) Payload Processing Team hoist the Tracking and Data Relay Satellite (TDRS-G) into a work stand in the Vertical Processing Facility (VPF) for mating with its Inertial Up…
STS-70 payload preparations
The primary payload of the STS-43 mission, Tracking and Data Relay Satellite-E (TDRS-E) attached to an Inertial Upper Stage (IUS) was photographed at the moment of its release from the cargo bay of the Space Shuttle Orbiter Atlantis. The TD…
Space Shuttle Projects
This artist's concept drawing depicts the Tracking and Data Relay Satellite-C (TDRS-C), which was the primary payload of the Space Shuttle Discovery on the STS-26 mission, launched on September 29, 1988. The TDRS system provides almost unin…
Space Shuttle Projects
STS029-78-019 (13 March 1989) --- Headed on its way to a much higher orbit is another Tracking and Data Relay Satellite (TDRS-D), as photographed with a 70mm camera from inside Discovery's cabin.  Moments earlier, the STS-29 crewmembers rel…
STS-29 IUS with TDRS-D after deployment from Discovery, OV-103
S92-40571 (August 1992) --- The five astronaut crewmembers assigned to fly aboard the Space Shuttle Endeavour for the STS-54 mission, pause for a break during training and preparations for the six-day mission.  Left to right are Donald R. M…
STS-54 Endeavour, OV-105, crewmembers participate in WETF briefing at JSC
STS-26 Discovery, Orbiter Vehicle (OV) 103, artwork depicts tracking and data relay satellite C (TDRS-C) deployment. OV-103 orbits above Earth in bottom-to-sun attitude, moments after TDRS-C's release into space. TDRS-C is seen just below o…
STS-26 Discovery, OV-103, artwork showing TDRS-C deployment
During STS-26, inertial upper stage (IUS) with the tracking and data relay satellite C (TDRS-C) located in the payload bay (PLB) of Discovery, Orbiter Vehicle (OV) 103, is raised into deployment attitude (an angle of 50 degrees) by the airb…
STS-26 Discovery, Orbiter Vehicle (OV) 103, IUS / TDRS-C deployment
During STS-26, inertial upper stage (IUS) with tracking and data relay satellite C (TDRS-C) located in the payload bay (PLB) of Discovery, Orbiter Vehicle (OV) 103, is positioned into its proper deployment attitude (an angle of 50 degrees)…
STS-26 Discovery, Orbiter Vehicle (OV) 103, IUS / TDRS-C deployment
STS043-72-020 (2 Aug 1991) --- The Tracking and Data Relay Satellite (TDRS-E), is loosened from its restraint device and begins to leave the payload bay of the earth-orbiting Atlantis.  The deployment came a mere six hours after the Space S…
STS-43 TDRS-E / IUS is deployed from OV-104's payload bay (PLB)
STS070-S-001 (March 1995) --- Designed by the crew members, the STS-70 crew patch depicts the space shuttle Discovery orbiting Earth in the vast blackness of space. The primary mission of deploying a NASA Tracking and Data Relay Satellite (…
STS-70 Crew Insignia
STS-43 Tracking and Data Relay Satellite E (TDRS-E) undergoes preflight processing in the Kennedy Space Center's (KSC's) Vertical Processing Facility (VPF) before being loaded into a payload canister for transfer to the launch pad and event…
STS-43 TDRS-E during preflight processing at KSC's VPF
STS026-31-071 (3 Oct 1988) --- After deployment from Discovery, Orbiter Vehicle (OV) 103, the inertial upper stage (IUS) with the tracking and data relay satellite C (TDRS-C) drifts above the cloud-covered Earth surface. TDRS-C, in stowed c…
STS-26 Discovery, Orbiter Vehicle (OV) 103, IUS / TDRS-C deployment
S89-27382 (29 Dec 1988) --- Technicians and engineers in the Kennedy Space Center's Vertical Processing Facility prepare to participate in the mating of the STS-29 tracking and data relay satellite (TDRS-D) with its inertial upper stage (IU…
STS-29 tracking and data relay satellite D (TDRS-D) mating at KSC VPF
STS006-38-894 (4 April 1983) --- The tracking and data relay satellite (TDRS) leaves the 18-meter (60-ft) long cargo bay of the Earth-orbiting space shuttle Challenger about ten hours following launch of NASA’s second reusable space vehicle…
Deployment of the TDRS by STS-6 Challenger
STS054-71-087 (13 Jan 1993) --- The Tracking and Data Relay Satellite (TDRS) is backdropped against the blackness of space, minutes after its release from the Space Shuttle Endeavour.  Onboard NASA's newest Shuttle for the six-day mission a…
IUS / TDRS-F drifts above the Earth's surface after STS-54 deployment
STS029-71-026 (13 March 1989) --- The Tracking and Data Relay Satellite (TDRS-D) is tilted in the cargo bay prior to its release via a remote system on Discovery's flight deck.  This photographic frame was among NASA's third STS-29 photo re…
STS-29 IUS / TDRS-D deployment from Discovery, OV-103, payload bay
STS043-72-002 (2 Aug 1991) --- The Tracking and Data Relay Satellite (TDRS-E), leaves the payload bay of the earth-orbiting Atlantis a mere six hours after the Space Shuttle was launched from Pad 39A at Kennedy Space Center, Florida. TDRS,…
STS-43 TDRS-E / IUS in OV-104's PLB ASE aft frame tilt actuator (AFTA) table
No more images