ENGINEERS FROM AMES RESEARCH CENTER AND MARSHALL SPACE FLIGHT CENTER REMOVE AVCOAT SEGMENTS FROM THE SURFACE OF THE ORION HEAT SHIELD, THE PROTECTIVE SHELL DESIGNED TO HELP THE NEXT GENERATION CREW MODULE WITHSTAND THE HEAT OF ATMOSPHERIC R…
Orion Heat Shield
CAPE CANAVERAL, Fla. -- Lockheed Martin technicians and engineers move the heat shield for the Orion crew module down the aisle inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Technicians have…
KSC-2014-2755
CAPE CANAVERAL, Fla. -- Lockheed Martin technicians and engineers monitor the progress as a crane lifts the Orion heat shield away from a stand inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida.…
KSC-2014-2749
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, Lockheed Martin technicians and engineers have positioned the heat shield near the Orion crew module. Technicians have i…
KSC-2014-2757
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, Lockheed Martin technicians and engineers have positioned the heat shield near the Orion crew module. Technicians have i…
KSC-2014-2758
CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, Lockheed Martin technicians monitor the progress as the Orion crew module is lifted from a test stand. Activities are und…
KSC-2014-2676
CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, Lockheed Martin technicians check the Orion crew module before it is lifted from a test stand. Activities are underway to…
KSC-2014-2675
CAPE CANAVERAL, Fla. -- Lockheed Martin technicians and engineers prepare a crane that will be used to lift the Orion heat shield inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Technicians ha…
KSC-2014-2746
Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane is attached to the Orion heat shield from Exploration Flight Test-1 for unloading off its transporter. The heat shield is being tran…
Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna
Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, the Orion heat shield from Exploration Flight Test-1 is secured on foam blocks. The heat shield is being transferred from the Orion Program…
Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna
A crane attached to the Orion heat shield for Artemis I moves it toward the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida on Oct. 23, 2017. Protective pads were att…
Orion Heat Shield Move
Heat shield back shell panels are prefitted on the Orion spacecraft inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. The back shell panels serve as the outer layer of the spacecr…
Orion EM-1 Crew Module with Back Shells
The Orion heat shield from Exploration Flight Test-1 has arrived in High Bay 2 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The heat shield is being transferred from the Orion Program to the Ground Syste…
Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna
The Orion heat shield for Artemis I is being prepared for its move to the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida on Oct. 23, 2017. Protective pads are being…
Orion Heat Shield Move
Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a worker monitors the progress as a crane lowers the Orion heat shield from Exploration Flight Test-1 onto foam blocks. The heat shield is b…
Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna
Lockheed Martin engineers and technicians are installing the heat shield to the Orion crew module July 25, 2018, inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Orion is being p…
Orion Heat Shield Installation
Lockheed Martin engineers and technicians are installing the heat shield to the Orion crew module July 25, 2018, inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Orion is being p…
Orion Heat Shield Installation
CAPE CANAVERAL, Fla. -- Lockheed Martin technicians and engineers attach the heat shield to the Orion crew module inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Technicians have installed mor…
KSC-2014-2830
CAPE CANAVERAL, Fla. -- Lockheed Martin technicians attach a crane to the Orion heat shield to prepare to move it away from a stand inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Technicians…
KSC-2014-2747
CAPE CANAVERAL, Fla. -- Lockheed Martin technicians and engineers move the heat shield for the Orion crew module down the aisle inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Technicians have…
KSC-2014-2756
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, Lockheed Martin technicians and engineers closely monitor the progress as a crane lowers the Orion heat shield onto a st…
KSC-2014-2751
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, a crane has lowered the Orion heat shield onto a stand. Technicians have installed more than 200 instrumentation sensors…
KSC-2014-2752
CAPE CANAVERAL, Fla. – The Orion crew module is positioned on a test stand inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Activities are underway to lift Orion and prepare it for future insta…
KSC-2014-2671
CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, a crane is being moved into position to lift the Orion crew module from a test stand. Activities are underway to prepare…
KSC-2014-2672
Technicians move the Orion heat shield for Artemis I toward the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida on Oct. 23, 2017. Protective pads were attached to the…
Orion Heat Shield Move
Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers help prepare the Orion heat shield from Exploration Flight Test-1 for unloading off its transporter. The heat shield is being transf…
Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna
Lockheed Martin technicians test the fitting of the Orion spacecraft's heat shield back shell panels inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. The back shell panels serve…
Orion EM-1 Crew Module with Back Shells
Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a worker helps prepare the Orion heat shield from Exploration Flight Test-1 for unloading off its transporter. The heat shield is being tran…
Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna
Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane is attached to the Orion heat shield from Exploration Flight Test-1 for unloading off its transporter. The heat shield is being tran…
Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna
Heat shield back shell panels are prefitted on the Orion spacecraft inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. The back shell panels serve as the outer layer of the spacecr…
Orion EM-1 Crew Module with Back Shells
Lockheed Martin engineers and technicians are installing the heat shield to the Orion crew module July 25, 2018, inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Orion is being p…
Orion Heat Shield Installation
Lockheed Martin engineers and technicians are installing the heat shield to the Orion crew module July 25, 2018, inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Orion is being p…
Orion Heat Shield Installation
CAPE CANAVERAL, Fla. -- The heat shield for the Orion crew module has been secured in a special work stand inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Technicians prepare to move the heat…
KSC-2014-2754
CAPE CANAVERAL, Fla. -- Lockheed Martin technicians and engineers monitor the progress and assist as needed as a crane begins to lift the Orion heat shield away from a stand inside the Operations and Checkout Building high bay at NASA's Ken…
KSC-2014-2748
CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, Lockheed Martin technicians check the Orion crew module. Activities are underway to lift Orion from a test stand and prep…
KSC-2014-2674
CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, Lockheed Martin technicians monitor the progress as the Orion crew module is lifted by crane from a test stand. Activitie…
KSC-2014-2677
CAPE CANAVERAL, Fla. -- The heat shield for the Orion crew module has been secured in a special work stand inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Technicians have installed more than…
KSC-2014-2753
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, Lockheed Martin technicians and engineers monitor the progress as a crane positions the Orion heat shield near the crew…
KSC-2014-2750
CAPE CANAVERAL, Fla. -- Lockheed Martin technicians and engineers attach the heat shield to the Orion crew module inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Technicians have installed mor…
KSC-2014-2831
Technicians move the Orion heat shield for Artemis I toward the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida on Oct. 23, 2017. Protective pads were attached to the…
Orion Heat Shield Move
Lockheed Martin engineers and technicians prepare the Orion heat shield for Artemis I for its move to the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida on Oct. 23,…
Orion Heat Shield Move
Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers help prepare the Orion heat shield from Exploration Flight Test-1 for unloading off its transporter. The heat shield is being transf…
Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna
Technicians move the Orion heat shield for Exploration Mission-1 toward the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Protective pads are being attached to the…
Orion Heat Shield Move
A technician checks the Orion heat shield for Artemis I before it is moved into the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida on Oct. 23, 2017. Protective pads…
Orion Heat Shield Move
Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lifts the Orion heat shield from Exploration Flight Test-1 up off its transporter. It will be lowered onto foam blocks. The heat shi…
Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna
Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress as a crane lowers the Orion heat shield from Exploration Flight Test-1 onto foam blocks. The heat shield is bei…
Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna
Lockheed Martin engineers and technicians prepare the Orion heat shield for Exploration Mission-1 for its move to the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida.…
Orion Heat Shield Move
A flatbed truck carrying the Orion heat shield from Exploration Flight Test-1, backs into High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The heat shield was moved from the Launch Abort System Fa…
Orion EFT-1 Heat Shield Move from LASF to VAB Highbay 2