CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, technicians prepare to remove the cover from the end of the Ares I-X motor segment for propellant grain inspection of the inter…
KSC-2009-2317
CAPE CANAVERAL, Fla. –In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the end of the Ares I-X motor segment is removed to allow propellant grain inspection of the interior.  It is one of four reusab…
KSC-2009-2318
CAPE CANAVERAL, Fla. –  In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, a technician performs propellant grain inspection of the inside of the Ares I-X motor segment. It is one of four reusable moto…
KSC-2009-2322
Members of the Airbus team preparing the Solar Orbiter spacecraft for launch pause for a photo inside the Astrotech Space Operations facility in Titusville, Florida. Solar Orbiter aims to study the Sun, its outer atmosphere and solar wind,…
Solar Orbiter Processing: Propellant Loading Operations at Astro
The Solar Orbiter spacecraft is loaded with propellants during processing activities inside the Astrotech Space Operations facility in Titusville, Florida. Solar Orbiter aims to study the Sun, its outer atmosphere and solar wind, and will p…
Solar Orbiter Processing: Propellant Loading Operations at Astro
HUU TRINH POSES WITH A HYPERGOLIC BI-PROPELLANT THRUSTER FOR A POTENTIAL APPLICATION ON FUTURE ROBOTIC LUNAR SPACECRAFTS.
1000760
Dr. Robert H. Goddard and a liquid oxygen-gasoline rocket in the frame from which it was fired on March 16, 1926, at Auburn, Massachusetts. From 1930 to 1941, Dr. Goddard made substantial progress in the development of progressively larger…
First Flight of a Liquid Propellant Rocket
U.S. Senator Mark Udall (D-CO) speaks at a Green Propellant Infusion Mission press conference at the Reserve Officers Association, Tuesday, July 9, 2013 in Washington.  The NASA GPIM program, led by Ball Aerospace in conjunction with Aeroje…
Green Propellant Infusion Mission
A 35,000-gallon liquid oxygen tank is placed at the A-3 Test Stand construction site on Sept. 24, 2010. The tank will provide propellant for tests of next-generation rocket engines at the stand. It will be placed upright on top of the stand…
A-3 Test Stand construction
NASA John C. Stennis Space Center employee Dustan Ladner (left) assists tanker driver David Velasco in transferring RP-1 fuel to a 20,000-gallon underground tank at the E-1 Test Stand during a March 30 delivery. The rocket propellant will b…
RP-1 delivered to E-1 Test Stand
Members of the Artemis I launch team monitor data at their consoles inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida during a cryogenic propellant tanking demonstration on Sept. 21…
Artemis I Cryogenic Propellant Tanking Test
Technicians prepare to transport NASA’s IMAP (Interstellar Mapping and Acceleration Probe) observatory to Building 2 where they will load 317 pounds (or 144 kilograms) of hydrazine into three tanks into the spacecraft at the Astrotech Space…
NASA's IMAP Moves for Propellant Loading
Photo shows how the Space Launch Sysetm (SLS) rocket liquid oxygen tank failed during a structural qualification test at NASA’s Marshall Space Flight Center in Huntsville, Alabama. The photos show both the water flowing from the tank as it…
Engineers Break SLS Rocket Propellant Tank On Purpose
Photo shows how the Space Launch Sysetm (SLS) rocket liquid oxygen tank failed during a structural qualification test at NASA’s Marshall Space Flight Center in Huntsville, Alabama. The photos show both the water flowing from the tank as it…
MSFC_2020_XP_SLS_P_ 005_PD002-Test-Case-TTF-4697 LOX Tank Test to Failure06242020 post test_168
Artemis I Launch Director Charlie Blackwell-Thompson, at right, monitors data inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida during a cryogenic propellant tanking demonstration o…
Artemis I Cryogenic Propellant Tanking Test
Photo shows how the Space Launch Sysetm (SLS) rocket liquid oxygen tank failed during a structural qualification test at NASA’s Marshall Space Flight Center in Huntsville, Alabama. The photos show both the water flowing from the tank as it…
Engineers Break SLS Rocket Propellant Tank On Purpose
CAPE CANAVERAL, Fla. –  In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida,  the open end of the Ares I-X motor segment is seen without the end cover.  It is one of four reusable motor segments and nozz…
KSC-2009-2321
CAPE CANAVERAL, Fla. –  In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida,  a technician begins propellant grain inspection of the interior of the Ares I-X motor segment. It is one of four reusable mot…
KSC-2009-2319
The Solar Orbiter spacecraft is transferred between buildings as it undergoes prelaunch processing at the Astrotech Space Operations facility in Titusville, Florida. Solar Orbiter aims to study the Sun, its outer atmosphere and solar wind,…
Solar Orbiter Processing: Spacecraft Transfer at Astrotech
This 1960 artist's concept shows a 24-hour communication satellite design incorporating an arc engine with a nuclear power source. The concept was one of many missions proposed by the Marshall Space Flight Center for electrically-propelled…
Early Program Development
Investigation of cambered propeller design for VTOL/STOL airplane. 3/4 front view of complete configuration, 0 deg.
Cambered Propeller Design for VTOL/STOL Airplane.
Investigation of cambered propeller design for VTOL/STOL airplane. 3/4 front view of Curtis VTOL propeller.
Cambered Propeller Design for VTOL/STOL Airplane.
An 80,000-gallon liquid hydrogen tank is placed at the A-3 Test Stand construction site on Sept. 24, 2010. The tank will provide propellant for tests of next-generation rocket engines at the stand. It will be placed upright on top of the st…
A-3 Test Stand construction
U.S. Senator Mark Udall (D-CO) speaks at a Green Propellant Infusion Mission press conference at the Reserve Officers Association, Tuesday, July 9, 2013 in Washington.  The NASA GPIM program, led by Ball Aerospace in conjunction with Aeroje…
Green Propellant Infusion Mission
Counter Rotating Propeller Model in the NASA Glenn 8x6-Foot Supersonic Wind Tunnel
Counter Rotating Propeller Model in the NASA Glenn 8x6-Foot Supe
Laser based blade deflection measurement system on Counter Rotation Pusher Propeller model in 8x6 SWT (Supersonic Wind Tunnel)
Laser based blade deflection measurement system on Counter Rotat
Photo shows how the Space Launch Sysetm (SLS) rocket liquid oxygen tank failed during a structural qualification test at NASA’s Marshall Space Flight Center in Huntsville, Alabama. The photos show both the water flowing from the tank as it…
Engineers Break SLS Rocket Propellant Tank On Purpose
Artemis I Launch Director Charlie Blackwell-Thompson, standing, leads a cryogenic propellant tanking demonstration inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida on Sept. 21, 202…
Artemis I Cryogenic Propellant Tanking Test
Members of the Artemis I launch team monitor data at their consoles inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida during a cryogenic propellant tanking demonstration on Sept. 21…
Artemis I Cryogenic Propellant Tanking Test
Technicians transport NASA’s IMAP (Interstellar Mapping and Acceleration Probe) observatory to Building 2 where they will load 317 pounds (or 144 kilograms) of hydrazine into three tanks into the spacecraft at the Astrotech Space Operations…
NASA's IMAP Moves for Propellant Loading
CAPE CANAVERAL, Fla. –  In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida,  technicians check the fit of the end cover on the Ares I-X motor segment.  It is one of four reusable motor segments and nozz…
KSC-2009-2320
CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the Ares I-X motor segment waits for inspection after removal of the shipping container. It is one of four reusable motor segme…
KSC-2009-2316
The Solar Orbiter spacecraft is loaded with propellants during processing activities inside the Astrotech Space Operations facility in Titusville, Florida. Solar Orbiter aims to study the Sun, its outer atmosphere and solar wind, and will p…
Solar Orbiter Processing: Propellant Loading Operations at Astro
The Solar Orbiter spacecraft is loaded with propellants during processing activities inside the Astrotech Space Operations facility in Titusville, Florida. Solar Orbiter aims to study the Sun, its outer atmosphere and solar wind, and will p…
Solar Orbiter Processing: Propellant Loading Operations at Astro
HUU TRINH POSES WITH A HYPERGOLIC BI-PROPELLANT THRUSTER FOR A POTENTIAL APPLICATION ON FUTURE ROBOTIC LUNAR SPACECRAFTS.
HUU TRINH
MICHELLE TILLOTSON, AN ENGINEER AT NASA’S MARSHALL SPACE FLIGHT CENTER, SHOWS KALYN HOPKINS A STUDENT AT THE MIAMI VALLEY SCHOOL, DAYTON OHIO, NEW EQUIPMENT THAT WILL BE USED TO TEST THE PROPELLANT TANKS FOR THE SLS
MICHELLE TILLOTSON WITH TEST EQUIPMENT
This photograph shows the Solid Propellant Test Article (SPTA) test stand with the Modified Nasa Motor (M-NASA) test article at the Marshall Space Flight Center (MSFC). The SPTA test stand, 12-feet wide by 12-feet long by 24-feet high, was…
Space Shuttle Projects
Tilt wing propeller model. 3/4 front view. 4 prop tilt wing nose down variable struts on ground board.  Leo Holl, NASA Ames Engineer.
Tilt Wing Propeller Model Tested in the Ames 40x80 Foot Wind Tunnel.
Technicians ready a single rotating propeller model in the 8x6 Supersonic Wind Tunnel
SINGLE ROTATING PROP MODEL IN THE 8 X 6 TEST SECTION
Dr. Michael Gazarik, Associate Administrator, NASA Space Technology Mission Directorate, answers a reporter's question at a Green Propellant Infusion Mission press conference at the Reserve Officers Association, Tuesday, July 9, 2013 in Was…
Green Propellant Infusion Mission
Roger Myers, Executive Director, Aerojet Rocketdyne speaks at a Green Propellant Infusion Mission press conference at the Reserve Officers Association, Tuesday, July 9, 2013 in Washington.  The NASA GPIM program, led by Ball Aerospace in co…
Green Propellant Infusion Mission
The Marshall Space Flight Center (MSFC) engineers test fired a 26-foot long, 100,000-pound-thrust solid rocket motor for 30 seconds at the MSFC east test area, the first test firing of the Modified NASA Motor (M-NASA Motor). The M-NASA Moto…
Space Shuttle Projects
NASA’s IMAP (Interstellar Mapping and Acceleration Probe) observatory arrives at Building 2 where technicians will load 317 pounds (or 144 kilograms) of hydrazine into three tanks into the spacecraft at the Astrotech Space Operations Facili…
NASA's IMAP Moves for Propellant Loading
Artemis I Launch Director Charlie Blackwell-Thompson leads a cryogenic propellant tanking demonstration inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida  on Sept. 21, 2022. The fir…
Artemis I Cryogenic Propellant Tanking Test
Members of the Artemis I launch team monitor data at their consoles inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida during a cryogenic propellant tanking demonstration on Sept. 21…
Artemis I Cryogenic Propellant Tanking Test
Artemis I Launch Director Charlie Blackwell-Thompson, at left, monitors data inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida during a cryogenic propellant tanking demonstration on…
Artemis I Cryogenic Propellant Tanking Test
Artemis I Assistant Launch Director Jeremy Graeber helps lead a cryogenic propellant tanking demonstration inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida on Sept. 21, 2022. The f…
Artemis I Cryogenic Propellant Tanking Test
No more images