N-206 12ft. Pressure Wind Tunnel reconstruction - installation of vanes
N-206 NASA Ames Research Center 12ft Pressure Wind Tunnel ADTE (Aeronautics Design & Test Environment) - test section
N-206 12ft W.T. ADTE Project (Aeronautics Design and Test Environment) controller drop #5 (N-206A)
N-206 pressure Wind Tunnel Reconstruction: settling chamber lift
N-206 12ft pressure wind tunnel reconstruction, welding and assembly of rings
Fundamental Film Cooling and Heat Transfer Facility, Ceramic Matrix Composite High Pressure Turbine Thermal Management Project,
N-206 12ft W.T. ADTE Project (Aeronautics Design and Test Environment) New piping to old valves
N-206 12ft W.T. ADTE Project (Aeronautics Design and Test Environment) Dryer area as is (N-206A)
N-206 12ft W.T. ADTE Project (Aeronautics Design and Test Environment) Old TPC valve actuators
N-206 12ft Pressure Wind Tunnel reconstruction - installation of vanes
N-206 12ft Pressure Wind Tunnel reconstruction
N-206 12ft Pressure Wind Tunnel reconstruction - settling chamber lift
N-206 12ft. PWT Reconstruction Aerial: foundation and begining crane assembly
N-206 12ft W.T. ADTE Project (Aeronautics Design and Test Environment) 3' conduit to dry air control panel
N-206 Ames 12ft Pressure Wind Tunnel
N-206 12ft Pressure Wind Tunnel reconstruction aerial with crane
N-206 NASA Ames Research Center 12ft w.t. Pressure Wind Tunnel reconstruction - turning vanes, fan being lifted in
N-206 NASA Ames Research Center 12ft Pressure Wind Tunnel. reconstruction - test section door
N-206 12ft Pressure Wind Tunnel reconstruction - looking out from inside of partially assembled test section