The core stage inter-tank umbilical – one of multiple connections on the mobile launcher that will provide power, communications, and pressurized gases to the rocket – is attached to the Space Launch System (SLS) core stage inside the Vehic…
OSA STA and Umbilicals
In High Bay 3 inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, teams with Exploration Ground Systems and Jacobs use the Orion stage adapter structural test article and the Mass Simulator for Orion for testing…
VAB Imagery of Test Articles - Orion Mass Simulator
Technicians with NASA’s Exploration Ground Systems Program attach the Orion stage adapter to the interim cryogenic propulsion stage atop the agency’s SLS (Space Launch System) Moon rocket inside Vehicle Assembly Building at NASA’s Kennedy S…
Artemis II OSA Integration
Tests are underway in High Bay 3 inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Aug. 13, 2021, using the Orion stage adapter structural test article and the Mass Simulator for Orion. Stacked atop the Space…
VAB Imagery of Test Articles - Orion Mass Simulator
Teams worked on the final processing of their payloads that will fly aboard Artemis I. Housed within the Orion stage adapter, the satellites – called CubeSats – are roughly the size of a large shoe box and weigh no more than 30 pounds. Desp…
Artemis I OSA Secondary Payload Load - NEA Scout and LunarIC
Teams prepare the Lunar IceCube before its installation in the Space Launch System rocket Orion stage adapter at NASA’s Kennedy Space Center in Florida. This small satellite will be deployed from the rocket and will orbit the Moon for six m…
Artemis I OSA Secondary Payload Load - NEA Scout and LunarIC
The Near-Earth Asteroid Scout team prepares their secondary payload for installation in the Space Launch System rocket’s Orion stage adapter at NASA’s Kennedy Space Center in Florida. NEA Scout will be deployed and go to an asteroid after t…
Artemis I OSA Secondary Payload Load - NEA Scout and LunarIC
Teams worked on the final processing of their payloads that will fly aboard Artemis I. Housed within the Orion stage adapter, the satellites – called CubeSats – are roughly the size of a large shoe box and weigh no more than 30 pounds. Desp…
Artemis I OSA Secondary Payloads - CuSP and LunaHMap
These images show the Orion stage adapter for Artemis II being prepped for shipment and then packaged in a large box, loaded on a semi-truck. It is seen leaving NASA’s Marshall Space Flight Center in Huntsville, Alabama, as it begins its jo…
Final Piece of Rocket Hardware for Artemis II Heads to Florida
These images show NASA employees attending an event August 14, 2025, at Marshall Space Flight Center in Huntsville, Alabama, to view the Orion stage adapter for Artemis II before it is transported to NASA’s Kennedy Space Center in Florida.…
NASA Employees View SLS Rocket Hardware Before its Upcoming Move to NASA Kennedy
Inside NASA’s iconic Vehicle Assembly Building at Kennedy Space Center in Florida, teams from Exploration Ground Systems and contractor Jacobs mate the Orion Stage Adapter (OSA) to the interim cryogenic propulsion stage (ICPS) on top of the…
Artemis I OSA Lift and Mate
These images show the Orion stage adapter for Artemis II being prepped for shipment and then packaged in a large box, loaded on a semi-truck. It is seen leaving NASA’s Marshall Space Flight Center in Huntsville, Alabama, as it begins its jo…
Final Piece of Rocket Hardware for Artemis II Heads to Florida
These images show the Orion stage adapter for Artemis II leaving NASA’s Marshall Space Flight Center in Huntsville, Alabama, as it begins its journey to NASA’s Kennedy Space Center in Florida. Manufactured at Marshall, this adapter for the…
Final Piece of Rocket Hardware for Artemis II Heads to Florida
Inside NASA’s iconic Vehicle Assembly Building at Kennedy Space Center in Florida, teams from Exploration Ground Systems and contractor Jacobs mate the Orion Stage Adapter (OSA) to the Interim Cryogenic Propulsion Stage (ICPS) on top of the…
OSA Lift & Mate Coverage
Seen here is a close-up view of the Orion stage adapter (OSA) structural test article atop the Space Launch System (SLS) rocket inside the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on Aug. 12, 2021. The test…
OSA STA and Umbilicals
Tests are underway in High Bay 3 inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Aug. 13, 2021, using the Orion stage adapter structural test article and the Mass Simulator for Orion. Stacked atop the Space…
VAB Imagery of Test Articles - Orion Mass Simulator
In High Bay 3 inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, teams with Exploration Ground Systems and Jacobs use the Orion stage adapter structural test article and the Mass Simulator for Orion for testing…
VAB Imagery of Test Articles - Orion Mass Simulator
Technicians with NASA’s Exploration Ground Systems Program attach the Orion stage adapter to the interim cryogenic propulsion stage atop the agency’s SLS (Space Launch System) Moon rocket inside Vehicle Assembly Building at NASA’s Kennedy S…
Artemis II OSA Integration
Teams worked on the final processing of their payloads that will fly aboard Artemis I. Housed within the Orion stage adapter, the satellites – called CubeSats – are roughly the size of a large shoe box and weigh no more than 30 pounds. Desp…
Artemis I OSA Secondary Payloads - Miles and Lunar IC
The LunIR undergoes inspection prior to being loaded in the Space Launch System (SLS) rocket’s Orion stage adapter for the Artemis I mission on July 14 at NASA’s Kennedy Space Center in Florida. During lunar orbit, the satellite will use an…
Artemis I OSA Secondary Payloads - Miles and Lunar IC
These images show NASA employees attending an event August 14, 2025, at Marshall Space Flight Center in Huntsville, Alabama, to view the Orion stage adapter for Artemis II before it is transported to NASA’s Kennedy Space Center in Florida.…
NASA Employees View SLS Rocket Hardware Before its Upcoming Move to NASA Kennedy
Teams worked on the final processing of their payloads that will fly aboard Artemis I. Housed within the Orion stage adapter, the satellites – called CubeSats – are roughly the size of a large shoe box and weigh no more than 30 pounds. Desp…
Artemis I OSA Secondary Payloads - CuSP and LunaHMap
Teams worked on the final processing of their payloads that will fly aboard Artemis I. Housed within the Orion stage adapter, the satellites – called CubeSats – are roughly the size of a large shoe box and weigh no more than 30 pounds. Desp…
Artemis I OSA Secondary Payload Load - NEA Scout and LunarIC
Teams worked on the final processing of their payloads that will fly aboard Artemis I. Housed within the Orion stage adapter, the satellites – called CubeSats – are roughly the size of a large shoe box and weigh no more than 30 pounds. Desp…
Artemis I OSA Secondary Payloads - CuSP and LunaHMap
Teams worked on the final processing of their payloads that will fly aboard Artemis I. Housed within the Orion stage adapter, the satellites – called CubeSats – are roughly the size of a large shoe box and weigh no more than 30 pounds. Desp…
Artemis I OSA Secondary Payload Load - NEA Scout and LunarIC
These images show the Orion stage adapter for Artemis II being prepped for shipment and then packaged in a large box, loaded on a semi-truck. It is seen leaving NASA’s Marshall Space Flight Center in Huntsville, Alabama, as it begins its jo…
Final Piece of Rocket Hardware for Artemis II Heads to Florida
These images show the Orion stage adapter for Artemis II leaving NASA’s Marshall Space Flight Center in Huntsville, Alabama, as it begins its journey to NASA’s Kennedy Space Center in Florida. Manufactured at Marshall, this adapter for the…
Final Piece of Rocket Hardware for Artemis II Heads to Florida
Inside NASA’s iconic Vehicle Assembly Building at Kennedy Space Center in Florida, teams from Exploration Ground Systems and contractor Jacobs mate the Orion Stage Adapter (OSA) to the Interim Cryogenic Propulsion Stage (ICPS) on top of the…
OSA Lift & Mate Coverage
These images show the Orion stage adapter for Artemis II being prepped for shipment and then packaged in a large box, loaded on a semi-truck. It is seen leaving NASA’s Marshall Space Flight Center in Huntsville, Alabama, as it begins its jo…
Final Piece of Rocket Hardware for Artemis II Heads to Florida
Technicians install the Korea AeroSpace Administration (KASA) K-Rad Cube within the Orion stage adapter inside the Multi-Payload Processing Facility at NASA’s Kennedy Space Center in Florida on Tuesday, Sept. 2, 2025. The K-Rad Cube, about…
Artemis II Secondary Payloads
Under a protective cover, the Orion Stage Adapter (OSA) arrives in High Bay 4 of the Vehicle Assembly Building on Oct. 4, 2021, at NASA's Kennedy Space Center in Florida. Teams will lift the ring-shaped OSA, filled with shoebox-sized CubeSa…
OSA Arrival in VAB High Bay 4
The core stage inter-tank umbilical – one of multiple connections on the mobile launcher that will provide power, communications, and pressurized gases to the rocket – is attached to the Space Launch System (SLS) core stage inside the Vehic…
OSA STA and Umbilicals
Under a protective cover, the Orion Stage Adapter (OSA) arrives in High Bay 4 of the Vehicle Assembly Building on Oct. 4, 2021, at NASA's Kennedy Space Center in Florida. Teams will lift the ring-shaped OSA, filled with shoebox-sized CubeSa…
OSA Arrival in VAB High Bay 4
Technicians with NASA’s Exploration Ground Systems Program attach the Orion stage adapter to the interim cryogenic propulsion stage atop the agency’s SLS (Space Launch System) Moon rocket inside Vehicle Assembly Building at NASA’s Kennedy S…
Artemis II OSA Integration
Technicians with NASA’s Exploration Ground Systems Program attach the Orion stage adapter to the interim cryogenic propulsion stage atop the agency’s SLS (Space Launch System) Moon rocket inside Vehicle Assembly Building at NASA’s Kennedy S…
Artemis II OSA Integration
Seen here is a close-up view of the Orion stage adapter (OSA) structural test article atop the Space Launch System (SLS) rocket inside the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on Aug. 12, 2021. The test…
OSA STA and Umbilicals
Technicians with NASA’s Exploration Ground Systems Program attach the Orion stage adapter to the interim cryogenic propulsion stage atop the agency’s SLS (Space Launch System) Moon rocket inside Vehicle Assembly Building at NASA’s Kennedy S…
Artemis II OSA Integration
Technicians with NASA’s Exploration Ground Systems Program attach the Orion stage adapter to the interim cryogenic propulsion stage atop the agency’s SLS (Space Launch System) Moon rocket inside Vehicle Assembly Building at NASA’s Kennedy S…
Artemis II OSA Integration
Teams worked on the final processing of their payloads that will fly aboard Artemis I. Housed within the Orion stage adapter, the satellites – called CubeSats – are roughly the size of a large shoe box and weigh no more than 30 pounds. Desp…
Artemis I OSA Secondary Payload Load - NEA Scout and LunarIC
A team prepares the LunaH-Map before its installation in the Space Launch System rocket Orion stage adapter at NASA’s Kennedy Space Center in Florida. Once deployed from the rocket, the CubeSat will orbit the Moon for two months while searc…
Artemis I OSA Secondary Payloads - CuSP and LunaHMap
Teams worked on the final processing of their payloads that will fly aboard Artemis I. Housed within the Orion stage adapter, the satellites – called CubeSats – are roughly the size of a large shoe box and weigh no more than 30 pounds. Desp…
Artemis I OSA Secondary Payloads - CuSP and LunaHMap
Teams worked on the final processing of their payloads that will fly aboard Artemis I. Housed within the Orion stage adapter, the satellites – called CubeSats – are roughly the size of a large shoe box and weigh no more than 30 pounds. Desp…
Artemis I OSA Secondary Payloads - Miles and Lunar IC
Teams worked on the final processing of their payloads that will fly aboard Artemis I. Housed within the Orion stage adapter, the satellites – called CubeSats – are roughly the size of a large shoe box and weigh no more than 30 pounds. Desp…
Artemis I OSA Secondary Payloads - Miles and Lunar IC
Team CuSP cheers on the solar CubeSat prior to loading it in the Space Launch System rocket Orion stage adapter at NASA’s Kennedy Space Center in Florida.
Artemis I OSA Secondary Payloads - CuSP and LunaHMap
Inside NASA’s iconic Vehicle Assembly Building at Kennedy Space Center in Florida, teams from Exploration Ground Systems and contractor Jacobs mate the Orion Stage Adapter (OSA) to the Interim Cryogenic Propulsion Stage (ICPS) on top of the…
OSA Lift & Mate Coverage
These images show the Orion stage adapter for Artemis II being prepped for shipment and then packaged in a large box, loaded on a semi-truck. It is seen leaving NASA’s Marshall Space Flight Center in Huntsville, Alabama, as it begins its jo…
Final Piece of Rocket Hardware for Artemis II Heads to Florida
Inside NASA’s iconic Vehicle Assembly Building at Kennedy Space Center in Florida, teams from Exploration Ground Systems and contractor Jacobs mate the Orion Stage Adapter (OSA) to the Interim Cryogenic Propulsion Stage (ICPS) on top of the…
OSA Lift & Mate Coverage
Fueling and servicing checks on the Orion spacecraft for the Artemis I mission are completed inside Kennedy Space Center’s Multi-Payload Processing Facility on July 8, 2021. The capsule will be transported to the Florida spaceport’s Launch…
Orion Stage Adapter (OSA) Secondary Payload Load