The solar arrays on NASA's InSight Mars lander were deployed as part of testing conducted Jan. 23, 2018, at Lockheed Martin Space in Littleton, Colorado. Engineers and technicians evaluated the solar arrays and performed an illumination tes…
InSight Lander Solar Array Test
While in the landed configuration for the last time before arriving on Mars, NASA's InSight lander was commanded to deploy its solar arrays to test and verify the exact process that it will use on the surface of the Red Planet. During the t…
InSight Lander Solar Array Test
While in the landed configuration for the last time before arriving on Mars, NASA's InSight lander was commanded to deploy its solar arrays to test and verify the exact process that it will use on the surface of the Red Planet. During the t…
InSight Lander Solar Array Test
Four Extreme Ultraviolet and X-ray Irradiance Sensors or EXIS instruments that will fly aboard four of NOAA's Geostationary Operational Environmental Satellite-R or GOES-R Series spacecraft were recently lined up like babies in a nursery.…
GOES EXIS Quadruplets Together in a Clean Room "Nursery"
What looks like a teleporter from science fiction being draped over NASA's James Webb Space Telescope, is actually a "clean tent." The clean tent protects Webb from dust and dirt when engineers at NASA's Goddard Space Flight Cente…
NASA's Webb Telescope Clean Room 'Transporter'
KENNEDY SPACE CENTER, FLA. -  In the clean room at NASA’s Hangar AE on Cape Canaveral Air Force Station (CCAFS), a Spectrolab technician, Anna Herrera,  points to an area on the Swift spacecraft’s solar array where cells will be removed and…
KSC-04pd1854
KENNEDY SPACE CENTER, FLA. -  A closeup of one of the solar cells that will be removed and replaced on the Swift spacecraft’s solar array.  Swift is a first-of-its-kind, multi-wavelength observatory dedicated to the study of gamma-ray burst…
KSC-04pd1856
A variety of space hardware for the Orion crew module is in view in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida on Oct. 3, 2017. Orion is undergoing processing to prepare it for its…
Orion Space Hardware In-Production inside the Operations and Che
Inside the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida, the Artemis II crew module adapter (CMA) is being relocated from the clean room to the Pressure Proof Cell for additional testing and main…
Artemis II Crew Module Adapter Move to Clean Room
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, assembly continues on Orion’s Artemis II crew module on Feb. 5, 2021. The capsule will house astronauts during its mission around…
Artemis II Crew Module Current Status
The Orion crew module for NASA’s Exploration Mission 1 (EM-1) is being secured in a work station in the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida. Orion will undergo additional proces…
Orion EM-1 Crew Module Move from Clean Room to Work Station
Thermal protection system panels are in view in the high bay of the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The Orion crew module for NASA’s Exploration Mission 1 (EM-1) is being prepared f…
Orion Space Hardware In-Production inside the Operations and Che
The Orion crew module for NASA’s Exploration Mission 1 (EM-1) is secured in a work station in the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida. Orion will undergo additional processing t…
Orion EM-1 Crew Module Move from Clean Room to Work Station
The Orion crew module pressure vessel for NASA’s Exploration Mission 1 (EM-1) is being moved from a clean room to a work station inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida.…
Orion EM-1 Crew Module Move from Clean Room to Work Station
Archival pictures of the Integrated Structural Assembly of Advanced Composites (ISAAC) In Clean Room in Building 1232A.  Integrated Structural Assembly of Advanced Composites (ISAAC) is a state of the art composite manufacturing robot. ISAA…
LRC-2021-B701_P-01576.TIF
Some of the 1,367 pounds of cargo the SpaceX Dragon spacecraft returned to Earth from the space station are seen in a clean room at the SpaceX rocket development facility, Wednesday, June 13, 2012 in McGregor, Texas.  NASA Administrator Cha…
SpaceX Dragon Cargo Transfer
While in the landed configuration for the last time before arriving on Mars, NASA's InSight lander was commanded to deploy its solar arrays to test and verify the exact process that it will use on the surface of the Red Planet. During the t…
InSight Lander Solar Array Test
While in the landed configuration for the last time before arriving on Mars, NASA's InSight lander was commanded to deploy its solar arrays to test and verify the exact process that it will use on the surface of the Red Planet. During the t…
InSight Lander Solar Array Test
An engineer in the clean room at Lockheed Martin Space in Littleton, Colorado, affixes a dime-size chip onto the lander deck of NASA's InSight spacecraft.  This second microchip, contains 1.6 million names submitted by the public to ride al…
Second Names Chip is Placed on InSight
NASA Glenn technician Ariana Miller prepares an ultrahigh vacuum chamber used to test the materials used in silicon carbide based sensors and electronics that can operate at extremely high temperatures (500 degrees Celsius and higher) for a…
Clean Room Facility
KENNEDY SPACE CENTER, FLA. -  In the clean room at NASA’s Hangar AE on Cape Canaveral Air Force Station (CCAFS), a Spectrolab technician, Anna Herrera,  places a new solar cell on the Swift spacecraft’s solar array.  Swift is a first-of-its…
KSC-04pd1858
KENNEDY SPACE CENTER, FLA. -  In the clean room at NASA’s Hangar AE on Cape Canaveral Air Force Station (CCAFS), a Spectrolab technician, Anna Herrera,  places a new solar cell on the Swift spacecraft’s solar array.  Swift is a first-of-its…
KSC-04pd1859
KENNEDY SPACE CENTER, FLA. -  In the clean room at NASA’s Hangar AE on Cape Canaveral Air Force Station (CCAFS), Spectrolab technicians begin lifting the protective cover from the Swift spacecraft. Two of Swift’s solar cells on the solar ar…
KSC-04pd1853
Workers have moved the Orion crew module pressure vessel for NASA’s Exploration Mission 1 (EM-1) out of a clean room inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida. The crew mod…
Orion EM-1 Crew Module Move from Clean Room to Work Station
Inside the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida, the Artemis II crew module adapter (CMA) is being relocated from the clean room to the Pressure Proof Cell for additional testing and main…
Artemis II Crew Module Adapter Move to Clean Room
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, assembly continues on Orion’s Artemis II crew module on Feb. 5, 2021. The capsule will house astronauts during its mission around…
Artemis II Crew Module Current Status
The Orion crew module pressure vessel for NASA’s Exploration Mission 1 (EM-1) is being moved from a clean room to a work station inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida.…
Orion EM-1 Crew Module Move from Clean Room to Work Station
A close-up view of Orion’s Artemis II crew module inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, on Feb. 5, 2021. The capsule will house astronauts during its mission around th…
Artemis II Crew Module Current Status
This panorama shows the inside of Goddard's High Bay Clean Room, as seen from the observation deck.   Credit: NASA/Goddard Space Flight Center/Chris Gunn  Go into a NASA Clean Room Daily with the Webb Telescope via NASA's 'Webb-cam' here:…
Clean Room at Goddard Space Flight Center
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, assembly continues on Orion’s Artemis II crew module on Feb. 5, 2021. The capsule will house astronauts during its mission around…
Artemis II Crew Module Current Status
Workers have moved the Orion crew module pressure vessel for NASA’s Exploration Mission 1 (EM-1) out of a clean room inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida. The crew mod…
Orion EM-1 Crew Module Move from Clean Room to Work Station
A variety of space hardware for the Orion crew module is in view in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Orion is undergoing processing to prepare it for its first uncrewed…
Orion Space Hardware In-Production inside the Operations and Che
A photograph showing what all four Magnetospheric Multiscale (MMS) spacecraft look like when stacked is seen taped to the window of a Naval Research Laboratory cleanroom where one of the four spacecraft is undergoing testing, Monday, August…
MMS at NRL
Clean room B 29 SSDIF facility floor was installed in January 2019 by Stonhard
GSFC_20190130_2019-5339_005
While in the landed configuration for the last time before arriving on Mars, NASA's InSight lander was commanded to deploy its solar arrays to test and verify the exact process that it will use on the surface of the Red Planet. During the t…
InSight Lander Solar Array Test
A technician works on the descent stage for NASA's Mars 2020 mission inside JPL's Spacecraft Assembly Facility. Mars 2020 is slated to carry NASA's next Mars rover to the Red Planet in July of 2020.  https://photojournal.jpl.nasa.gov/catalo…
JPL Tech Works Mars 2020 Descent Stage
The James Webb Space Telescope was lifted out of its assembly stand for the last time at NASA's Goddard Space Flight Center in Greenbelt, Md. In this photo, the telescope was hanging upside down as the lift crew were about to install it in…
NASA's Webb Telescope Inside Goddard Clean Room
A crane in a clean room at NASA's Goddard Space Flight Center in Greenbelt, Md., lowers a test mass simulator (center of frame)  onto the Ambient Optical Assembly Stand or AOAS to ensure it can support the James Webb Space Telescope's Optic…
Dropping in on a Clean Room Webb Test
KENNEDY SPACE CENTER, FLA. -  In the clean room at NASA’s Hangar AE on Cape Canaveral Air Force Station (CCAFS), a Spectrolab technician, Anna Herrera,  removes one of the solar cells that will be replaced on the Swift spacecraft’s solar ar…
KSC-04pd1857
KENNEDY SPACE CENTER, FLA. -  In the clean room at NASA’s Hangar AE on Cape Canaveral Air Force Station (CCAFS), a Spectrolab technician, Anna Herrera,  points to the two new solar cells removed and replaced on the Swift spacecraft’s solar…
KSC-04pd1860
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, assembly continues on Orion’s Artemis II crew module on Feb. 5, 2021. The capsule will house astronauts during its mission around…
Artemis II Crew Module Current Status
One of the work stations is in view in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Orion is undergoing processing to prepare it for its first uncrewed integrated flight atop the Sp…
Orion Space Hardware In-Production inside the Operations and Che
Workers inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, continue assembly of Orion’s Artemis II crew module on Feb. 5, 2021. The capsule will house astronauts during its mission…
Artemis II Crew Module Current Status
A few of the work stations and work stands are in view inside the high bay in the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The Orion crew module pressure vessel is undergoing processing to p…
Orion Space Hardware In-Production inside the Operations and Che
The Orion heat shield is undergoing processing in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida.  Orion is being prepared for its first uncrewed integrated flight atop the Space Launc…
Orion Space Hardware In-Production inside the Operations and Che
S89-27382 (29 Dec 1988) --- Technicians and engineers in the Kennedy Space Center's Vertical Processing Facility prepare to participate in the mating of the STS-29 tracking and data relay satellite (TDRS-D) with its inertial upper stage (IU…
STS-29 tracking and data relay satellite D (TDRS-D) mating at KSC VPF
The Orion heat shield is undergoing processing in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida.  Orion is being prepared for its first uncrewed integrated flight atop the Space Launc…
Orion Space Hardware In-Production inside the Operations and Che
Thermal protection system panels are in view in the high bay of the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The Orion crew module for NASA’s Exploration Mission 1 (EM-1) is being prepared f…
Orion Space Hardware In-Production inside the Operations and Che