
At Goddard, the engineers use the Acoustic Test Chamber, a 42-foot-tall chamber, with 6-foot-diameter speaker horns to replicate the launch environment. The horns use an altering flow of gaseous nitrogen to produce a sound level as high as…

The NASA Administrator's Seal, painted onto the rear wall of the Acoustic Test Chamber at NASA's Goddard Space Flight Center in Greenbelt, Md.

The Orion launch abort system and crew module test articles undergo stacking at Lockheed Martin’s facilities near Denver in preparation for acoustic testing on Aug. 15, 2011. To emulate the sound pressure levels experienced at launch, the t…

Technicians position microphones around the Orion launch abort system and crew module test articles in preparation for the second round of testing in the acoustic chamber at Lockheed Martin’s facilities near Denver on Aug. 16, 2011. The veh…

The Orion launch abort system and crew module test articles undergo stacking at Lockheed Martin’s facilities near Denver in preparation for acoustic testing on Aug. 15, 2011. To emulate the sound pressure levels experienced at launch, the t…

OSAM-1 engineer, Alvaro Haesbaert discusses the upcoming operations with Safety engineer, Paul Messanger inside the acoustics chamber at Goddard Space Flight Center, Greenbelt Md., Aug 25, 2023. This photo has been reviewed by OSAM1 project…

Mechanical engineering and integration technician, Lucas Keim, stands inside the Acoustics chamber at Goddard Space Flight Center, Greenbelt Md., Aug 24, 2023. This photo has been reviewed by OSAM1 project management and the Export Control…