AERIAL PHOTOGRAPHS OF MSFC-4619
2016 MSFC AERIALS
NASA ADMINISTRATOR BOLDEN IS BRIEFED ON NEA SCOUT PROGRESS BY TIFFANY RUSSELL
CHARLES BOLDEN BRIEFED BY TIFFANY RUSSELL
NASA ADMINISTRATOR BOLDEN IS BRIEFED ON NEA SCOUT PROGRESS BY LES JOHNSON
CHARLES BOLDEN BRIEFED BY LES JOHNSON
Engine section test stand in building 4619 prior to test article being installed.
Engine section test stand in building 4619 prior to test article
 SHELL BUCKLING KNOCKDOWN FACTOR (SBKF) PROJECT - COMPOSITE TEST ARTICLE, (CTA) 8.3 – Post test
Shell Buckling Knockdown Factor (CTA) 8.3 Post Test
 SHELL BUCKLING KNOCKDOWN FACTOR (SBKF) PROJECT - COMPOSITE TEST ARTICLE, (CTA) 8.3 – Post test
Shell Buckling Knockdown Factor (CTA) 8.3 Post Test
Robert Bobo, standing extreme right, and technicians view as SLS Intertank Test Article, ITA, is attached to crosshead of load test Annex, Bldg. 4619
SLS Intertank Test Article, ITA, is attached to crosshead of load testAnnex, Bldg. 4619, and removed from bed of KMAG transporter
CENTER DIRECTOR ROBERT LIGHTFOOT AND  MATERIALS ENGINEER LARRY PELHAM, EXAMINE COMPOSITE CREW MODULE AT THE ENVIRONMENTAL TEST FACILITY IN BLDG. 4619 AS MODULE IS BEING PREPARED FOR SPACE ENVIRONMENTAL TESTING.
1200009
SLS Intertank Test Article, ITA, is attached to crosshead of load test Annex, Bldg. 4619, and removed from bed of KMAG transporter.  ITA is slowly raised from bed of KMAG transporter and KMAG is removed.
SLS Intertank Test Article, ITA, is attached to crosshead of loa
SLS Intertank Test Article, ITA, is attached to crosshead of load test Annex, Bldg. 4619, and removed from bed of KMAG transporter.  ITA is slowly raised from bed of KMAG transporter and KMAG is removed.
SLS Intertank Test Article, ITA, is attached to crosshead of loa
On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team.  NASA Administrator Jim Bridenstine addre…
NASA Administrator Jim Bridenstine visits Marshall Space Flight
The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing
The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC
The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing
The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC
On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team.  NASA Administrator Jim Bridenstine addre…
NASA Administrator Jim Bridenstine visits Marshall Space Flight
The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing
The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC
The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing
The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC
At NASA's Kennedy Space Center in Florida, members of the news media tour the spaceport's Vehicle Assembly Building VAB. Like the Apollo Saturn V and space shuttles of the past, the Space Launch System rocket will be stacked and checked out…
The Media Tour the BFF, VAB, and the ML
AERIAL PHOTOGRAPHS OF MSFC-4619
2016 MSFC AERIALS
NASA ADMINISTRATOR BOLDEN IS BRIEFED ON NEA SCOUT PROGRESS BY ALEX SOBEY
CHARLES BOLDEN BRIEFED BY ALEX SOBEY
NASA ADMINISTRATOR BOLDEN IS BRIEFED ON NEA SCOUT PROGRESS BY LESLIE MCNUTT
CHARLES BOLDEN BRIEFED BY LESLIE MCNUTT
 SHELL BUCKLING KNOCKDOWN FACTOR (SBKF) PROJECT - COMPOSITE TEST ARTICLE, (CTA) 8.3 – Post test
Shell Buckling Knockdown Factor (CTA) 8.3 Post Test
 Dr. Ruth Jones, conducts safety walkthrough of structures and scaffolds in Building 4619.
Dr. Ruth Jones photos for University of Arkansas Alumni publication
 SHELL BUCKLING KNOCKDOWN FACTOR (SBKF) PROJECT - COMPOSITE TEST ARTICLE, (CTA) 8.3 – Post test
Shell Buckling Knockdown Factor (CTA) 8.3 Post Test
SLS INTERTANK TEST ARTICLE IS ATTACHED TO CROSSHEAD OF LOAD TEST ANNEX, BLDG. 4619,  AND REMOVED FROM BED OF KMAG TRANSPORTER.  Matt Cash conducts tag up meeting before lift of ITA from KMAG transporter
SLS INTERTANK TEST ARTICLE IS ATTACHED TO CROSSHEAD OF LOAD TEST ANNEX, BLDG. 4619, AND REMOVED FROM BED OF KMAG TRANSPORTER
SLS Intertank Test Article, ITA, is attached to crosshead of load test Annex, Bldg. 4619, and removed from bed of KMAG transporter.  Rob Ziegler, (L), and Roger Myrick (R), of Aerie Aerospace attach load lines to Aft Load Ring of Intertank…
SLS Intertank Test Article, ITA, is attached to crosshead of loa
Technicians are removed from SLS Intertank Test Article, ITA, after attaching to crosshead of load test Annex, Bldg. 4619,
SLS Intertank Test Article, ITA, is attached to crosshead of loa
SLS Intertank Test Article, ITA, is attached to crosshead of load test Annex, Bldg. 4619, and removed from bed of KMAG transporter.  ITA is slowly raised from bed of KMAG transporter and KMAG is removed.
SLS Intertank Test Article, ITA, is attached to crosshead of loa
The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing
The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC
The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing
The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC
On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team.  NASA Administrator Jim Bridenstine addre…
NASA Administrator Jim Bridenstine visits Marshall Space Flight
The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing
The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC
The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing
The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC
The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing
The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC
On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team.  NASA Administrator Jim Bridenstine addre…
NASA Administrator Jim Bridenstine visits Marshall Space Flight
AERIAL PHOTOGRAPHS OF MSFC-4619
2016 MSFC AERIALS
THE SHELLBUCKLING KNOCKDOWN FACTOR 27.5-FOOT-DIAMETER TEST ARTICLE BEING MOVED INTO PLACE IN THE HIGH BAY OF BUILDING 4619.
1100132
Engine section test stand in building 4619 prior to test article being installed.
Engine section test stand in building 4619 prior to test article
 SHELL BUCKLING KNOCKDOWN FACTOR (SBKF) PROJECT - COMPOSITE TEST ARTICLE, (CTA) 8.3 – Post test
Shell Buckling Knockdown Factor (CTA) 8.3 Post Test
 SHELL BUCKLING KNOCKDOWN FACTOR (SBKF) PROJECT - COMPOSITE TEST ARTICLE, (CTA) 8.3 – Post test
Shell Buckling Knockdown Factor (CTA) 8.3 Post Test
SLS Intertank Test Article, ITA, is attached to crosshead of load test Annex, Bldg. 4619, and removed from bed of KMAG transporter.  Rob Ziegler, L, and Roger Myrick, R, of Aerie Aerospace attach load lines to Aft Load Ring of Intertank Tes…
SLS Intertank Test Article, ITA, is attached to crosshead of loa
SLS Intertank Test Article, ITA, is attached to crosshead of load test Annex, Bldg. 4619, and removed from bed of KMAG transporter.  ITA is slowly raised from bed of KMAG transporter and KMAG is removed.
SLS Intertank Test Article, ITA, is attached to crosshead of loa
SLS Intertank Test Article, ITA, is attached to crosshead of load test Annex, Bldg. 4619, and removed from bed of KMAG transporter.  ITA is suspended from crosshead of Load Test Annex
SLS Intertank Test Article, ITA, is attached to crosshead of loa
SLS Intertank Test Article, ITA, is attached to crosshead of load test Annex, Bldg. 4619, and removed from bed of KMAG transporter. Rob Ziegler, (L), and Roger Myrick (R), of Aerie Aerospace attach load lines to Aft Load Ring of Intertank T…
SLS Intertank Test Article, ITA, is attached to crosshead of loa
On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team.  NASA Administrator Jim Bridenstine addre…
NASA Administrator Jim Bridenstine visits Marshall Space Flight
The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing
The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC
The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing
The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC
SLS Intertank Test Article, ITA, is attached to crosshead of load test Annex, Bldg. 4619, and removed from bed of KMAG transporter.  Rob Ziegler, (L), and Roger Myrick (R), of Aerie Aerospace attach load lines to Aft Load Ring of Intertank…
SLS Intertank Test Article, ITA, is attached to crosshead of loa
 The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing. STA emerges from Barge Pegasus.
The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC.